On progress - Installation Network system project
Manage to install Fiber optic and access point at CPPC
On progress - Installation Lamp(Lowbay) project
Manage to install lamp at CPF โรงชําแหละสุกร สระแก้ว 25 lamp and test
2024 - Spark EV Station project
Design electrical system for EV Station 17 locations.
2024 - Arun Plus Market Place
Design electrical system for EV Station 5 locations.
2024 - Manage installation solar rooftop at G Tower
Manage team and contractor for installation solar rooftop at G Tower 280 kW
2024 - Manage installation solar rooftop for house
Manage contractor for installation solar rooftop micro inverter system 5 kW