Fiber Optic Routing, Core Assignment (Auto CAD) Design
Provide a Site Survey Report documentation to assess the amount of equipment and equipment required to perform Fiber Optic installations.
Auto CAD drawing , check drawing Micro Soft Excel, Auto CAD
Implement Support installation team.
Design Google Earth Pro
Key Job Effect ,None
Report Documernt
Regarding the installation of telephone towers in DTAC 4G / LTE, 3G / 2100 and 3G / 850
Report Documernt
Check drawing
To make the Document including (report, PAT Documents, Equipment inspection etc.)