Eastern Material Company Limited
Site Engineer (Jul 2020-2022)
• Direct and oversee project at construction sitesMBKR 235.04 kWp. Solar Rooftop Project
• MBKB 122.04 kWp. Solar Rooftop Project
• TNDBC 102.83 kWp. Solar Rooftop Project
• Yusen (Laemchabang) 251.10 kWp. Solar Rooftop Project
Neo Clean Energy Co., Ltd.
Site Engineer
• 2023 Solar PV Rooftop Power Plant, 402 kWp, Chachoengsao, Thai Parkerizing Co., Ltd. (Gateway phase 2 Car park), Engineering Procurement Construction (EPC),
• 2022 Solar PV Rooftop Power Plant, 636 kWp, Chachoengsao, Thai Parkerizing Co., Ltd. (Gateway),
Engineering Procurement Construction (EPC),
• 2022 Solar PV Rooftop Power Plant, 478.23 kWp, Samutprakan, Thai Parkerizing Co., Ltd. (Bangpoo Soi 8),
Engineering Procurement Construction (EPC),
• 2022 Solar PV Rooftop Power Plant, 935.77 kWp, Samutprakan, Thai Parkerizing Co., Ltd. (Bangpoo Soi 12),
Engineering Procurement Construction (EPC),
• 2022 Solar Farm, 5,020.54 kWp, Solar Floating 514.08 kWp, Construction Phase