Learning and practice by following topics
1.Civil work for Petrochemical Plant
2. Review Standard DWG.
3. Review Specification
4. Basic for soil investigation report review
5. Type of foundation
6. Type of piling
7. Type of super structure
8. Load to be considered on structure design
9. Basic for RC. Design
10.Basic for Steel design
11.Basic for Material Take off GCME
Control, and inspect various structural works.
Check the progress checklist for various parts, such as piling work, slab work,
beam work, column work, etc.
Take off Material for Hybrid dry wall in project.
Calculate concrete quantity for structure.