1.Provide bidding and proposal for ILI inspection.
2.Co-ordinate internally and externally regarding the construction matter.
3.Established progress reporting formant jointly with project manager/project engineer and construction manager
4.Mobilization and demobilization plan and detail site set up
5.Equipment and tools planning for ILI inspection
6.Manpower planning for ILI inspection.
7.Monitoring progress to weekly and monthly
8.Co-ordinate and control sub-contractor.
9.Provide permit to work
10.Provide method statement to work.
11.Project control under budget.
1.Provide bidding and proposal.
2.Prepare material take-off sheet to project engineer for cost estimated of change order and obtain from client.
3.Co-ordinate internally and externally regarding the construction matter.
4.Established progress reporting formant jointly with project Manager/project engineer and construction manager.
6.Mobilization and demobilization plan and detail site set up.
7.Equipment and tools planning.
8.Manpower planning.
9.Monitoring progress to weekly and monthly.
10.Co-ordinate and control sub-contractor.
11.Provide permit to work.
12.Provide method statement to work.
มิถุนายน 2554 ถึง มิถุนายน 2552
Project estimator
บริษัท วิลลิสเซอร์วิส แอน คอนสตัคชั่น จำกัด
155, ตำบล นิคมพัฒนา อำเภอนิคมพัฒนา ระยอง 21180
สำหรับสมาชิกเท่านั้น
1.Estimating project
2.Services and consulting with customers about insulation work.
3.Material take off and BOQ
4.Sales insulation materials that customers request.
1.)โครงการและผลงาน
1.1) Crane inspection
Detail of project
- Rough Terrain Crane Inspection load capacity 50ton,75ton
- Terrain crane inspection load capacity 220ton
- Crawler crane inspection load capacity 300ton,500ton,600ton
1.2) Client : GLOBAL CHEMICA PLC.
Project GC MAINTENANCE AND ENGINEERING.
Detail of project
- In line inspection of 16" Ethane (Underground)
- In line inspection of 6" Propane (Underground)
- Intelligent pigging pipeline inspection service.
1.3) TTLNG Receiving Terminal Expansion – Phase II
Client: PTTLNG
PMC: TOKYO GAS
Main sub contractor : IHI and POSSCO
Detail of project
- Tankage No.T-003 and T-004
- Stored product for LNG vapor capacity 160,000 m³
- Tank dimeter: 80 m. x 36.7 m. tank high.
- Design code: API 620
- Insulation type. Cellular Glass / Perlite / Glass Wool.
1.4) CFP CONCURENT PROJECT.
Client : Thai oil public company limited.
Project management consultant. :Worly parson limited.
Detail of project
- Tankage No.T-30C7,T-30C8,T-30C9
- Fuel oil storage tank.
- Stored product for fuel oil capacity 17,000 m³
- Tank dimeter: 29 m. x 26 m. tank high
- Design code: API650
- Internal & external painting.
1.5) PTT LNG NONG FAB LNG receiving terminal project
Client: PTTLNG
Project management consultant : Tokyo Gas Engineering.
Main sub contractor: CTCI and SAIPEM
Detail of project
- Tankage No.0600-T-001
- Stored product for Raw water capacity 15,398 m³
- Tank dimeter: 34 m. x 19.5 m. tank high
- Design code: API650
- Internal & external painting.
1.6) PO & POLYOLS PROJECT (Tank 2 unit)
Client: Thai tank terminal
Detail of project
1.6.1) tankage No.T-1704
- Stored product for Propylene oxide capacity 7,312 m³
- Tank dimeter: 23 m. x 21 m. tank high.
- Design code: API620
- Internal floating roof type. Full contract type.(SS304 &Aluminum)
- Insulation type. PIR foam for cold.
1.6.2) tankage No.T-4301
- Stored product for Propylene oxide capacity 2,500 m³
- Tank dimeter: 13 m. x 21 m. tank high.
- Design code: API650
- Insulation type. PIR foam for cold.
1.7) TOP New Tank Project. ( Tank 5 Unit)
Client: Thai oil refinery
Detail of project
1.7.1) Tankage No.T-3087
- Stored product for JET A-1 capacity 18,910 m³
-Tank dimeter: 36 m. x 22 m. tank high.
-Design code: EN 14015-2004
-Internal & external painting.
1.7.2)Tankage No.T-3071
- Stored product for UG91/95 capacity 24,715 m³
- Tank dimeter: 39 m. x 22 m. tank high
- Design code: EN 14015-2004
- Internal & external painting.
1.7.3)Tankage No.T-3057
- Stored product for UG91/95 capacity 14,844 m³
- Tank dimeter: 30 m. x 22 m. tank high.
- Design code: EN 14015-2004
- Internal & external painting.
1.7.4)Tankage No.T-30A1,A2
- Stored product for Jet A-1/GASOIL capacity 59,040 m³
- Tank dimeter: 60 m. x 22 m. tank high.
- Design code: EN 14015-2004
- Internal & external painting.
- Aluminum dome roof
- Internal floating roof type. Full face contract type.(Fiber glass with honeycomb.)