• Prepare cost estimate for project bidding & variation work.
• Providing & compare specification to correct follow standard requirement according from client.
• Review & recheck design drawing related building mechanical systems for The factory.
• Review & Ensuring projects for about quality, time and cost.
• Calculated cost & Control all cover the project jobs.
• Planning and control budget.
• Prepare scope,Construction schedule & Specification of works.
• Submitting the approved design accompanied by respective budgets and reports to the concerned department for implementation.
• Procurement material for construction.
• Material receiving inspection.
• Check shop drawing.
• Follow up and monitoring to fabrication, installation.
• Maintained relationship with clients, subcontractors, and staff( ME & Civil ).
• Informed clients and superiors about the project progress.
• Drafted safety regulations, construction reports and quality control plans.
• Test commissioning & Training.
• Final document to client.
• Review client comment on submitted document.
• Analytical and problem solving skills.
ประวัติการฝึกอบรม
พฤษภาคม 2566 ถึง พฤษภาคม 2566
Electrical And Electronics Institute
Management Program
ความสามารถ
ความสามารถทางภาษา
พูด (ดี) อ่าน (ดี) เขียน (ดี)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย คำ/นาที อังกฤษ คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,
- Auto Cad
- Microsoft Office ( Word, Excel, Power Point )
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
PERSONAL STATEMENT
Work experience 19 years in factory building for installation and construction management planning for Mechanical System. HVAC,Chiller,Boiler,Cooling tower,Plumbling,Sanitary,Fire Protection system&Utility system. Familiar with Cost estimater & Variation order.Providing & Compare specification to correct follow standard requirement according from client, Design & Shop Drawing, Safety, Document All Concerns the jobs,Method statement,Detail installation, Test&Commissioning There is a data base for Thai and International design standards. Coordinate with construction manager, Internal team,Compare Supplier & Sub-contractor. Experience in fabrication and installation. Which can planning and monitor job to achieved,Can working under pressure and hard works. Familiar with analyze and solve problems. Calculating quality,time,cost & safety of projects. Committed, Focused & Determined to complete the jobs.
Project Reference
Fujikoki Saraburi ( Thai Takenaka Main-contractor ) For New Factory ( 2004 )
Factory’s business : Air Conditioner parts.
• Aircondition,Ventilation,Plumbling,Sanitary,Utility & Fire protection System.
Honda Rojana Ayuthaya ( Thai Nishimusu ) For New Factory & Renovate Jobs (2004 -2005 )
Factory’s business : Automobile parts.
• Aircondition,Ventilation( Chiller System ) ,Plumbling,Sanitary,Utility,Fire protection System.
Inoac Ayuthaya ( Thai Takenaka ) For New Factory ( 2005 - 2006 )
Factory’s business : Automobile parts.
• Aircondition,Ventilation,Plumbling System,Sanitary,Utility System,Fire Protection & Boiler System.
Hoya Ayuthaya ( Thai Obayashi ) For New Factory( 2006 - 2007 )
Factory’s business : Glasses production.
• Aircondition,Ventilation( Chiller System ),Sanitary Plumbling System,Utility System,Fire Protection.
Saka Amatanakorn Chonburi ( Thai Nishimusu ) For New Factory ( 2007 )
Factory’s business : Nuts & boults production.
• Aircondition,Ventilation,Plumbling System,Utility System.
Musto Amatanakorn ( Thai Fukuda ) For New Factory ( 2007 )
Factory’s business : Plastic pellets production.
• Aircondition,Ventilation,Plumbling System,Utility System & Fire Protection.
Ngk Sensor Ph8 Amatanakorn ( Thai Toda )For New Factory , Renovate Jobs , Hook up Machine Work (2008-2013)Factory’s business : Automobile parts.
• Aircondition,Ventilation,Plumbling System,Utility System ,Chiller System, Heatexchanger
( Coolanace Machine ),Fire Protection. & LPG System.
Ngk Spark Plugs Ph7 Amatanakorn ( Thai Toda ) For New Factory Warehouse( 2010-2011 )
Factory’s business : Automobile parts.
• Aircondition,Ventilation,Plumbling System,Utility System & Fire Protection.
Yodoko( PPT ) Amatanakorn Ph7 ( Thai Shimizu ) For New Factory ( 2013-2014 )
Factory’s business : Automobile parts.
• Aircondition,Ventilation,Plumbling System,Utility System ,& Fire Protection( CO2 System )
Ngk Spark Tec Ph10 Amatanakorn ( Thai Takenaka )( 2015-2016 )
Factory’s business : Automobile parts.
• Aircondition,Ventilation,Plumbling System,Utility System ,& Fire Protection
Ngk Sensor Ph8 Amatanakorn ( Thai Obayashi ) For New Factory , Renovate Jobs & Hook up Machine Work ( 2017-2019 )
Factory’s business : Automobile parts.
• HVAC,Plumbling System,Utility System ,Chiller System, Heatexchanger( Coolanace Machine ) ,Fire Protection & LPG System.
Sakata INK Samutsakorn ind. ( Thai Nishimutsu ) For New Ink. Plant Factory , Renovate Jobs & Hook up Machine Work plant ( Boiler,Chiller,Cooling tower,Lpg,Hot box heat process,Reactor tank & pump for process production controller ), 2019-2020
Factory’s business : Ink factory production.
• Aircondition,Ventilation,Plumbling System,Utility System ,Chiller System, Cooling tower System ,Fire Protection,Chemical Mixing Tank plant & Pump,Boiler System & LPG System.
Nihonichi Saraburi. ( Thai Shimizu ) For New Factory , ( 2020-2021 )
Factory’s business : Food factory production.
• HVAC (Chiller System),Plumbling System,Utility System , Fire Protection,Boiler System & LPG System.
Nachi Rayong ( Thai Shimizu ) For New Factory , ( 2021-2022 )
Factory’s business : Automobile parts.
• Aircondition,Ventilation,Plumbling System,Utility System ,Cooling tower System, ,Fire Protection & LPG System.
K-Line Logistics ( Thai Penta-Ocean ) For New Cold Storage Factory , ( 2022-2023 )
Factory’s business : Logistics & Cold Storage Business.
• Aircondition,Ventilation,Plumbling System,Utility System ,Fire Protection System.
JLK Tower Sukumwit ( Thai Kajima ) For New Office Complex , ( 2023-2024 )
Factory’s business : Office Complex Building For Rent.( 32 Storey )
• HVAC ( Chiller System )Aircondition,Ventilation,Plumbling System
Toyota Boshoku Asia ( Thai Takenaka ) For Renovate For New Test Room, ( 2023-2024 )
Factory’s business : Automobile parts.
• HVAC ( Control temp&humi )Aircondition,Ventilation,Plumbling System