- Coordinate with clients, Architects, and local authorities.
- Resolved technical issues and supervised the Engineering Process.
- Scheduled the project timeline and took action per schedule.
- Carried out regular safety audits and ensured that all safety protocols were being followed on-site.
- Submitted reports and documentation including materials requests, tools, manpower requirements, and daily progress reports.
มกราคม 2564 ถึง มิถุนายน 2564
M&E Engineer
PLIC AG Myanmar
Yangon, Myanmar
สำหรับสมาชิกเท่านั้น
- Controlled site progress and construction activities as per approved Shop Drawings.
- Implemented quality control measures to ensure that construction materials, methods, and workmanship.
- Conducted thorough testing and commissioning of M&E systems to verify functionality.
- Facilitated communication between project stakeholders.
ประวัติการฝึกอบรม
พฤษภาคม 2563 ถึง สิงหาคม 2563
MMK Engineering Co., Ltd
Intenship Training Program For M&E Services
ความสามารถ
ความสามารถทางภาษา
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
พูด (ดี) อ่าน (ดี) เขียน (ดี)
ไทย คำ/นาที อังกฤษ คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,รถจักรยานยนต์ ,
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
- Electrical, Mechanical , and ELV System Design & Installation at Parami Valley Residence
- Thesis ( Automatic Fire Sprinkler System and Control System for Commercial Building) at Final Year
- Projects ( Electrical Installation for Smart Home) at fourth year.