Perform field inspection.
Reviewed document related as WPS / PQR / WQT / Procedure NDE method
method statement comply with project specifications and code standards.
Reviewed shop drawing and weld-map included preparation and rectification.
Material verification to comply with project specifications requirements appearance
dimension.
Monitored and inspection welder qualification accordance with project specification
and codes standard requirement.
Inspection welding consumables storage and condition suitable to comply with
project specifications requirements.
Fit-up inspection of single past and election assembly to comply with shop drawing
and weld map according specifications requirements.
Monitoring and inspection welding process and welding parameters checked
including register of welder during weld to comply WPS and record report welding
surveillance.
Visual inspection after weld finished according specification requirement.
Update status of joint in access system and prepared report fit-up / visual
Reviewed welding history sheet.
Identify joint NDE and issue NDE request to third party companies.
Monitored and inspection NDE process inspection.
Reviewed NDE report and sign approval report.
Monitored percent reject late of the welder and analyze the root cause of
imperfections to rectification case UT rejected.
Weekly report to Supervisor and Main contractor.
Support QA to rectification and close NCR case.
Verification documentation & Traceability MDR.
Application code: AWS D.1.1 and EN1090
Material Type: S355JR / SM490YA / SS400 / S275JR / A325MSG / A1101
กันยายน 2556 ถึง พฤษภาคม 2564
NDT Supervisor
IS Industry Thailand
Rayong Thailand
สำหรับสมาชิกเท่านั้น
Discuss information of job, clearing scope of work and work condition at site
with client before start work.
Recommended NDT method to appropriate with condition of work piece to
client.
Prepared NDT procedure and method statement submit to client.
Prepared scan plan and plan schedule to perform to inspection submit to
client.
Demonstration NDT technique to use inspection and qualify performance
NDT personal with client.
Plan team NDT staff to work on site.
Observation and coordinate with team to rectification any problems
occurrence duration inspection.
Perform NDT inspection with method MT, PT, UT, UTM, VT, PAUT,
TOFD, PMI on site.
Interpretation of result NDT inspection to analyze and decide accept or reject
comply with code standard requirement.
Make and final reviewed report and sign approve report before submit to
client.
Control document rerated below accordance ISO 9001 standard.
มิถุนายน 2554 ถึง กันยายน 2555
QC. Inspector
Deeline Construction
Rayong Thailand
สำหรับสมาชิกเท่านั้น
Inspection stamp code / condition surface and length of material comply with
check list and record result.
Inspection dimension of beam and plate after cutting and mark stamp reference
shop drawing.
Fit-up inspection single part joint preparation assembly reference shop
drawing.
Visual inspection after weld finished.
In put result of Fit-up inspection, Visual inspection, to database and make
report submit to main contractor sign approval.
Received and check joint NDT request form main contractor and surface
preparation joint for NDT inspection.
Coordinate with team NDT to perform NDT and record result to update to
database and main contractor.
ประวัติการฝึกอบรม
พฤศจิกายน 2564 ถึง พฤศจิกายน 2564
TWI Training Thailand
Welding Inspector CSWIP 3.1
มกราคม 2567 ถึง มกราคม 2567
KET. Engineering and Training Center co.,Ltd.
Magnetic particle Testing Level II (SNT-TC-1A)
มกราคม 2567 ถึง มกราคม 2567
KET. Engineering and Training Center co.,Ltd.
Ultrasonic Testing Level II (SNT-TC-1A)
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย 40 คำ/นาที อังกฤษ 25 คำ/นาที
รถยนต์ ,
รถยนต์ ,
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Project: CRISP PROJECT: Main Contractor: Tecnicas Reunidas
Owner: ExxonMobil
Shutdown or turnaround and shot time maintained with company:
PTT GC Group, SCG Chemical group, SCG Paper group, Glow SPP11 Plant, Air Liquid
Plant, Sumitomo SHI FW, IRPC Plant, Michelin Plant, NS Siam United Steel (1995)
Plant, Indorama Petrochemical Plant, Bangkok Industrial Gas (BIG) Plant, Bangkok
Synthetics (BST) Plant, TUV SUD (Lide Indonesia) Plant, National Power (NPP) Plant,
Institute de Soudure Morocco at Maroc Solar cell Power pant Plant, Myanmar Power
Plant, Saipem Malaysia, TUV SUD Singapore, TTCL,VPE.
Project TROLLA TPCIC PROJECT Owner: Statoil and Aibel Thailand
Limited.
Project OSX3 PROJECT Owner: MODEC and Aibel Thailand Limited
Project GUDRUN PROJECT Owner: Statoil and Aibel Thailand Limited.