QA/QC Review for offshore inspection reports: MT, PT, UT, VT, UTM, IRIS, GVI, CVI, Flare, Pressure Vessel, Structure, Piping, Well Casing, Wellhead, Flowline, Production Header Manifold, Test Header Manifold, Anomaly.
Prepare documents for offshore teams: ITP inspection test plan, AutoCAD ISO Drawing, P&ID and last inspection reports.
Submitting the final reports, final inspection records and inspection DATA into the PTTEP Inspection Tracking Files Online System;
i. to ensure all the reports meet the PTTEP standard requirements
ii. to ensure no missing reports and secure DATA.
สิงหาคม 2561 ถึง กันยายน 2564
R&D Section Manager
Dacon Inspection Technologies
Banchang, Rayong
สำหรับสมาชิกเท่านั้น
Development and mass production of 3MHz and 5MHz ultrasonic acoustic transducers for In-line Inspection Pigging tool for 150km Gas Pipeline.
UT Multi-Channel Pigging DATA Analysis.
Caliper Pig DATA Analysis.
Chunnel Gauge DATA Analysis.
Caliper In-Line inspection arm material research and development for anomaly detection and location mapping.
Development for offshore NDE inspection applications such as UAV Drone, Corrosion mapping, Tank robotic mapping, Corrosion Under Pipe Support CUPS, EMAT, MRUT, Chunnel Gauge: ExxonMobil Research Project.
Assisted Inspection Department Manager to create a plan to enter the new market for business development such as IRATA Rope Access.
Reviewed budget and recommended cost reduction strategies.
Evaluated and updated current processes and procedures as necessary.
Monitored equipment used and recommended alternatives that would reduce the cost of the project and enhance quality.
Assisted Department Manager to prepare and review Proposals, Quotation, P.R, P.O, Invoice, Payment and Contract for all jobs.