-Develops comprehensive project plans, including setting objectives, defining timelines, and identifying necessary resources. Creates a work breakdown structure and communicates it to stakeholders.
-Manages both human and material resources associated with the project to ensure efficient utilization in accordance with established guidelines.
-Tracks the progress of the project and provides regular reports to the relevant team members. Includes addressing issues and making adjustments to the plan as necessary.
-Engages in effective communication with the project team and stakeholders to convey relevant information pertaining to the project.
-Inspects and manages the quality of the work as specified in the project plan.
มิถุนายน 2565 ถึง สิงหาคม 2566
Production engineer
AGC Flat Glass (Thailand) public CO. LTD
สำหรับสมาชิกเท่านั้น
-Improvement process for increase productivity
-Plan and assign time for production in due time
-Collect data for analysis from failure in production
-Organize manpower for work by station
-Report result and adjust production performance Key performance
-Design visualization arrange production plan with tableau
-Automation (RPA) updated result production and visual with tableau
-Analysis downtime and verification data for improvement in production
เมษายน 2564 ถึง พฤษภาคม 2565
Process engineer
QMB CO. LTD
สำหรับสมาชิกเท่านั้น
-Manage and prepare SOP for operators to follow up and check for ensure operators work correctly
-Set up machines in production line and monitor performance
-Training new operators to work according to plan process
-Improve productivity on target yield rate
-Analysis failure work piece from process and find solution to reduce waste
-Meeting report and summary to manager and client every week
Key project
-Respone assembly production line (Google nest mini)
-Set up and installation machine trial run production line (Microsoft surface laptop)