Production Planning Manager, Production Manager, Warehouse Manager
100,000บาท ขึ้นไป
16 ต.ค. 2567
4 พ.ย. 2567
ตำแหน่งที่สนใจ
Production Planning Manager, Production Manager, Warehouse Manager
ประวัติการศึกษาสูงสุด
จบการศึกษาแล้ว ในปี พศ. 2507
ปริญญาโท King Mongkut‘s University of Technology Thonburi
Master Degree
Production Engineer
3.13
ปริญญาตรี Kasem Bandit University.
Bachelor Degree
Electrical Engineer.
2.98
ประวัติการทำงาน
28 ปี
ไม่ได้ระบุ
Senior Production Control and Logistic Manager.
Clarion Asia Co., Ltd. (Rayong)
Rayong
สำหรับสมาชิกเท่านั้น
Production Planning Control Task (8 years)
• Have experience in new plant setup for Production Planning and Material Control Systems, Warehouse and Logistic Systems, Barcode Systems, and Production Systems.
• Overall manage and control inventory (Production-Sale-Inventory) of factory / KPI reduce inventory.
• Create strategy optimization operation planning and Inventory long-term plan.
• Sale Forecast data analysis ensures correct data and decides on optimization factory capacity plan.
• Leader for S&OP meeting, Master Production Schedule (MPS, Monthly, Weekly Plan) control reach production output target
• Capacity 4M Plan (SMT, Assembly Process) and EMS outsource control Out-In Parts consignment and Semi parts control without any stop line
• 4 M. Plan and Decide to Optimize Production Planning for Minimize Production Operation Cost
• SMT-EMS Quotation outsourcing and operation cost control under process budget cost
• SMT Production Outsource Control and Material Outsource Consignment Control.
• Material Plan and Control parts supplier delivery performance control and Improvement parts shortage.
• Production output monitoring and Improvement production reduce waste of operation.
• Delivery Finished Control and Monitoring delivery to customer milk-run on time.
• Parts supply to the production line on time control.
• Experience Set up a new plant for the new production line.
• Co-operate Logistic team to control import parts and shipment of goods to Japan, USA
Procurement Task
• Release parts long team yearly forecast to Supplier for set budget and cost negotiate
• Release parts forecast advance N+4 months for Capacity Survey Confirm from supplier 4M plan
• Release fix PO to supplier and 4 Weekly delivery confirmation
• Manage Supplier / Monitoring Control parts for delivery on time.
• Supplier monthly performance evaluation score and improve supplier lower than KPI.
• Leader Annual plan and Audit supplier with core team IATF16949
• Escalate Reduce Inventory by reducing PO ordering lead time with the supplier
• Parts NG quality claim follow-up and monthly summarize charge claim cost
• Handle Supplier parameter settings in the system in case of wrong conditions in the SAP system
Warehouse Task
• Manage FIFO part storage
• Set up Max-Min control Sub-Material
• Set Bare code for the storage system, Address Setting.
• Electronic parts (IC) WH environment parameter control, electrostatic, temperature, humidity
• Control system error in received-storage-supply (Raw Material, Finish Good, Sub-Material)
• Handle Warehouse operator 50 persons. & team leader 5 persons
• Stock diff, Improvement accuracy from 90 to 99% weekly cycle count.
• Physical Quarter Counting stock improvement from manual count to using barcode scan count reduces human error and reduces stock counting lead time from 3 to 1.5 days
• Control operation packing for export shipment
• Leader Kaizen with the WH team
Production Manager (+5 years)
Operation
• Production end-line output control reaches planning target Hourly, Daily, and Weekly
• Handle Production Operation 4M shortage and reduced waste (Man, Material, Machine, Method)
• Control and follow up production line stop closely and improve production OEE%
• Operator in a short-term and long term plan set budget
• Production Efficiency and Productivity maintain KPI company goal
• Setting procedure for start line control process parameter.
• Setting loss code in the system for analysis of waste for improvement
• Leader projects with core team process engineering, design for lean activity, reduce cycle time, etc.
Cost
• Human Productivity Control (Utilization Operator refer to Engineering Process Design line configuration)
• Improve operator process actual cost to reach finance standard cost target
• Handle Production KPI, Productivity, (Human cost, Material Scrap)
Quality
• Set up an activity to improve the reduce customer claim quality issue.
• Handle quality internal claim operator error assembly, defect, and scarp rate reach target.
• Improvement (Kaizen)
• Set up an activity to improve cost saving on the production process, and reduce material scrap.
• Motivate line leader and operator 5S, QCC activity, and Kaizen Award
• Improve team skills with subordinates.
System Skill
• Have AS400-MRP Program Skill
• Have SAP Implement Skill, BOM Module, Scheduling Planning Module (PP), Material Module (MM)
Inventory Module (MB),
• Have knowledge of the Push-Pull system
• Excellence Excel program, Excel Marco for Production plan data such as Calculate, etc.