System Integration Test Leader (WPL)
Project: BTS Green Line (Bangkok) – CF450 and Cairo Monorail (Egypt) – CF650 Full
• Test execution planning, estimation of schedule, time and budget to align with project schedule. • Test execution as per test plan release and project plan.
• Lab setup and software installation for system Integration lab.
• Manage the various configuration of integration & testing labs.
• Report and follow up for NCRs status in defect tracking and change management tool. • Co-ordinate with sub-system(s) for troubleshooting and bug fixing.
• Participate in technical meetings with system and sub-system engineers.
• Participate in project meetings for project schedule.
• Create integration test cases to properly test the system functions to align with System Requirements and Design Specifications.
• Test execution documents (Test procedures, Test Report, Test Environment and Test records).
เมษายน 2556 ถึง พฤษภาคม 2558
Surface Electronics Technician & BSO
Schlumberger Oversea S.A.
อำเภอเมือง จังหวัดพิษณุโลก
สำหรับสมาชิกเท่านั้น
Surface Electronics Technician
• Test & Maintenance Surface equipment (Depth Transducer, Pressure Transducer, Hook load Sensor,
Sensor cable ,Acquisition system (e-SAM, TSIM, ASAP, MCMP))
• Test & Maintenance Logging Unit System (Purging System, Inspection & Lifting Certificate) • Order, Planning, Inventory, Packing and Transport for Surface equipment & Tool operation kit
Battery Safety Officer
• Order, Planning and inventory for lithium battery follow Min-Max quantity • Prepare, Packing and Transport lithium battery to the job
• Take care of lithium battery unit & safety of lithium batteries store inside