▪ Considered the initial cost from sketch designs, set bugets for payments, inventory needs and materials.
▪ Assembled the arrangements for subcontractors and propietor.
▪ Achieved and arranged data to complete designs, visiting job sites to complete measuretments as necessary.
▪ Appraised the cash of subcontractors by workdone and asserted to owner.
▪ Braced for section details, penetration drawing and slab & wall penetration drawing.
▪ Went through technical designs, and drawings to assure that they are pursued correctly.
▪ Developed tender documentations.
▪ Found out rebar cage fabrication and installation quality.
มีนาคม 2558 ถึง มิถุนายน 2562
Quantity Surveyor
Mindhama Co., Ltd.
Myanmar
สำหรับสมาชิกเท่านั้น
▪ Classified the initial cost from sketch designs, fixed bugets for payments, inventory needs and materials.
▪ Earned and planned data to complete designs, visiting job sites to complete measuretments as necessary.
▪ Qualified the bills for subcontractors by their workdone.
▪ Corrected technical designs, and drawings to insure that they are chased correctly.
ไม่ได้ระบุ
Site Engineeer
MS Construction Co., Ltd.
Myanmar
สำหรับสมาชิกเท่านั้น
▪ Analyzed and audited daily work for quality control.
▪ Dealt with the workers to grab the best quality and safety during accomplishing.
▪ Elicited the bar bending schedule.
▪ Arrayed to bring about the target withing the schedule plans.
▪ Closed the daily report and material request to general manager.
▪ Comfirmed concrete slump test quality before concrete casting.
▪ Accredited the other burdens by managing director.