• Succeed in reducing defective problem of hot rolling mill process by creating Plan-Do-Check-Act (PDCA) plan.
• Succeed in reducing defective problem of shear process using CPK.
• Succeed in increasing more productivity of inflation process by using machines instead of human.
• Reach 90% target for reducing defective problem of hot rolling mill process in 2021.
• Reach 90% target for reducing defective problem of shear process in 2021.
• Reach 80% target for increasing more productivity of inflation process in 2021.
• Improve manufacturing processes of Model Line T300 Front Door Line LH/RH (NB, HB) in 2013.
• Improve manufacturing processes of Model Line T300 Rear Door Line LH/RH (NB,HB) in 2013.
• Improve manufacturing processes of Model Line T300 Lift Gate in 2014.
• Able to increase the production capacity, reduce labour, increase quality, waste reduction in the
manufacturing.
• Win the first place for quality type at engineer levels in 2013.
• Earn second place award for quality type at engineer levels in 2012.