- Preparation work package, work permit and Material.
- Control manpower to work follow schedule and drawing / quality.
- Site Survey such as, Preparation the any work.
- Fabrication and erection control subcontract.
- Preparation Crane for Subcontractor for Piping work.
- Progress of piping installation and schedule.
- Review and control Final Line Check & Clearance Punch list.
- Witness Inspection for Pressure Test, Flushing and Reinstatement.
- Steam Blowing work.
- Drawing As-Built for field work.
- Control Package piping Work and Document Control.
- Attended Daily Meeting to confirm the work progress, inform any problem and submit owner.
กุมภาพันธ์ 2563 ถึง ธันวาคม 2563
Piping Supervisor
GCME
สำหรับสมาชิกเท่านั้น
- Preparation work package, work permit control and Material.
- Control manpower to work follow schedule and drawing / quality.
- Site Survey such as, Preparation the any and Piping line checking, Punching pipe work.
- Fabrication and erection control subcontract.
- Preparation Crane and plan for Subcontractor for Piping work.
- Welding Hot Tapping on Live Pressure Piping work.
- Hot Tapping on Pressure Piping work and wrapping Tie-in Point.
- Review and control Final Line Check & Clearance Punch list.
- Witness Inspection for Pressure Test, Flushing and Reinstatement.
- Drawing As-Built for field work.
- Control Package piping Work and Document Control.
- Attended Daily Meeting to confirm the work progress, inform any problem and submit owner.
เมษายน 2561 ถึง กรกฎาคม 2562
Piping Supervisor
GCME
สำหรับสมาชิกเท่านั้น
- Preparation work package, work permit and Material.
- Control manpower to work follow schedule and drawing / quality.
- Site Survey such as, Preparation the any work.
- Fabrication and erection control subcontract.
- Preparation Crane for Subcontractor for Piping work.
- Progress of piping installation and schedule.
- Review and control Final Line Check & Clearance Punch list.
- Witness Inspection for Pressure Test, Flushing and Reinstatement.
- Steam Blowing work.
- Drawing As-Built for field work.
- Control Package piping Work and Document Control.
- Attended Daily Meeting to confirm the work progress, inform any problem and submit owner.