(True (UPC6) – Ericsson GUL Project), Central and West
- DTA and Optimize position. Taking care SSO , Cluster , PAC report , CVT report , for improved KPI coverage and quality. The optimizing tool NEMO Analyzer, Google Earth, Mapinfo
- OSS monitor site on-air and optimize stat for PAT report.balance load for site upgrade and clear
black cell site target.
- Meeting with customer and DTA for improve coverage and stat KPI
Detail
- Improve intra frequency handover degrade for adjust offset site to site
- For balance load form HB to LB adjust cell MLB open overlap and threshold.
- For balance load form LB to HB adjust flag priority and adjust threshold A1,A2,A4
- For balance load to NB site can adjust coverage base A1,A2,A4
- And improve SCG change, SCG MOD, SgNB Add, CQI bad rate.
(True (UPC6) – Ericsson GUL Project), Central and West
- DTA and Optimize position. Taking care SSO , Cluster , PAC report , CVT report , for improved KPI coverage and quality. The optimizing tool NEMO Analyzer, Google Earth, Mapinfo
True Move Co, Ltd., Thailand in Bangkok-South (Permanent)
3G and LTE (850MHz , 2100MHz) Design Jan 2016 – May 2016
- Tracking project Low Throughput
- Redesign Run-Way Suwannaphum airport
- Redesign Silom road
- Redesign Mega Bangna carpark zone event
➢ 3G and LTE (850MHz , 2100MHz) RF/Optimization July 2015 – Dec 2015
- Project district optimization and plan new site area poor coverage
- Create the drive route for keep logfile and analysis problem causes poor coverage. NO Dominate , Pilot Pollution
- Analysis Drive test problem causes Poor Coverage, No Dominate, Pilot Pollution
- Support event Songkran festival , New Year monitoring KPI DL Power Cong., UL Power Cong., DL CE Cong., UL CE Power Cong., Code Cong
- Neighbor Optimization and audit (Intra & Inter frequency)
Swiftcom Engineering Co., Ltd
3G and LTE (850MHz , 2100MHz) Optimization True Move Bangkok-South Oct 2014 – July 2015
- Create the drive route for keep logfile and analysis problem causes poor coverage. NO Dominate , Pilot Pollution
- Neighbor Optimization and audit (Intra & Inter frequency)
- Analysis Drive test problem causes Poor Coverage, No Dominate, Pilot Pollution
- Analyze by Actix and NEMO Analyze ( RSCP , Ec/No , Active set , Pilot pollution )
- Analysis by M2000
3G (2100MHz) Drive test , Post process AIS (North East) : Jan 2014 – Oct 2014
- Create the drive route for keep logfile and analysis problem causes poor coverage.
Raytel Thailand Co., Ltd
3G and LTE (2100MHz) Drive test and walk test for DTAC BKK : Apr 2013 – Oct 2014
- Drive test SSO , CVT , Cluster
- Test by TEMS Discovery