10/33, Floor 1A, The Trendy Building, Sukhumvit Road, Soi 13, Kloengtoey-Nua, Wattana, กรุงเทพมหานคร 10110
สำหรับสมาชิกเท่านั้น
April 2020 - Present
TRUE Project
- Report CVT (Coverage Verification Test) LITE UMTS ANd 5G MR.
- Report OPEN PA (Problem Areas) Analysis clueter turing
(Coverage and Quality:) and plotted Log file LTE,UMTS And 5G NR.
- Present report to customer for solution to balance Coverage,Quality
and User find root cause and find the final solution.
- Report DT KPI Optimzation Acceptance Report.
- Report OSS KPI (Praject Swap site) Anahysis, Moniter and Justification
mainy KPI and Present report to custarer for Analysis and justifcation KPI.
- Report FAC True (North) Anahysis, Moniter KPI and parameter degrade need to find roat cause
and find the final solution and Justification under Ericsson
Oce 2018 - Aprll 2020
OCK Steadcom Thiland ( DTAC Project L2300 )
- Analysis Custer tuning (Coverage and Quality) LTE 2300 under Ericsson
Netwark,troubleshooting and parameter degrade need to find roat cause
and find the final solution.
- Repart PAC (Provisianal Acceptance Report) Custer tuning (Coverage and
Quality) and plotted log file LTE 2300.
-Report FAC (Final Acceptance Report) Analysis Cluster for balance Coverage
and Quality.
- Analysis troubleshooting adjust antenna E-Tilt,M-Tit ,Azimuth
and parameter CRS Gain for balance Coverage and Quality.
มกราคม 2559 ถึง ตุลาคม 2561
RF Engineer
ERICSSON
สำหรับสมาชิกเท่านั้น
Report and check mainly KPI in team of daily basis.
- werking with 2G 3G 4G statste KP# report.
Prepare temolate counters and formulas KPI for 26 3G and 4G with PRS
Huawer , ENID Enesson and Netact Nokle.
Scheduling report for PRS Huanel and ENIQ Enk55on.
- Prepare Daily Dump K-Get Encsson and Dump CME Huawel
Exporting Drump TXT/XML for 2G 3G 4G Huawef iInto MS. ACCESS.
- Create wesdy Capacily Report 3G84G for all Network Huawel Ericsson
and Nokle.
- Make Daily warst Cell and Top 10 for Huawei and Ericsson KPL.
Make 3G and 4G Utlization every week.
- Make cell downtime report every week.
- Make Cluster base report KPI every week.
- Make Target and Baseline report every Manth.