1. Finding new and update regulations/standards related to Washing machines and Tumbler dryer products, parts of product, imports and exports.
•Follow and find out about the new and update regulations/standards from various sources concerned with Washing machines and Tumbler dryer products. The standard must be in accordance with each country in which the sale is planned or market under responsibility. The countries under my responsibility there is APAC region(Thailand, Japan, Korea, Malaysia, Philippines, Singapore, Indonesia, Taiwan, China, Hong Kong, Mongolia, Vietnam, AU/NZ and Guam)
•After finding information/regulation I must be reading, analyzing, interpreting and summarizing the standard requirements related to Washing machines and Tumbler dryer products. Making a plan for how to implement the requirements.
2. Submission the product to test with 3rd/in-house laboratory and request certifications product with Government agencies. • Considering and selecting the representative model to test according to the standards and requirements of each country. Examples of standard requirement: Safety (IEC 60335-2-1, IEC 60335-2-7, IEC 60335-2-11), EMC (CISPR14-1), EMF (EN 62233), WIFI (EN300 328 and EN62311) standards, etc.
•After finished selecting the representative model must be sending the product to test at 3rd laboratory. Moreover, to follow up during testing in case the test results failed testing or any problem must be analyzied and resolved problem with tester until successful.
•After completing the test will be received draft test report from the test lab then check the results and values are according to target and requirement or not. • After the test results are correct and complete, I will be sending test report including application to the authority or Government agencies of each country for requesting the certificate approval.
• After obtaining a certificate must check the markings that have been identified in the product and the carton. By checking the actual drawing and part whether it is compliant with the requirements of that country before shipping to sale.
3. Factory new model and surveillance model audit • Get an annual surveillance audit, I’m be the leader in meeting and dividing the duties and responsibilities of each department to prepare for supporting the factory audit.
• Supporting the calibration equipment test, documentation and standards in during the audit and according to the requirements of standard.
4. Cost down Project
Consider changing or replacing part, its relevance or effect to the regulatory requirement and need/no need re-apply a certification.
1. Finding new and update regulations/standards related to air conditioners product, parts of product, imports and exports.
•Follow and find out about the new and update regulations/standards from various sources concerned with air conditioning product. The standard must be in accordance with each country in which the sale is planned or market under responsibility. The countries under my responsibility there are 2 regions as follow; 1. Asia (Thailand, Australia, New Zealand, Philippines, Pakistan and the new/market country). 2. Latin America (Mexico, Argentina, Brazil, Chile, Colombia, Ecuador, Salvador, Peru and the new/market country)
•After finding information/regulation I must be reading, analyzing, interpreting and summarizing the standard requirements related to air conditioners. Make a plan for how to implement the requirements.
2. Submission the product to test with 3rd/in-house laboratory and request certifications product with Government agencies.
• Considering and selecting the representative model to test according to the standards and requirements of each country. Examples of standard requirement: Safety (IEC 60335-2-40, IEC 60335-1), EMC (CISPR14-1), EMF (EN 62233), Performance (ISO 16357), WIFI (EN300 328 and EN62311) standards and etc.
•After finished selecting the representative model must be sending the product to test at 3rd or in-house laboratory. Moreover to follow up during testing in case the test results not pass or any problem must be analyzed and resolved problem with tester until successful.
•After completing the test will be received draft test report from the test lab then check the results and values are according to target and requirement or not.
• After the test results are correct and complete, I will be sending test report including application to the authority or Government agencies (Example: For Thailand market there are TISI, EGAT and NTFA) of each country for requesting the certificate approval.
• After obtaining a certificate must check the markings that have been identified in the product and the carton. By checking the actual drawing and part whether it is compliant with the requirements of that country before shipping to sale. 3. Factory new model and surveillance model audit
• Get an annual surveillance audit, I’m be the leader in meeting and dividing the duties and responsibilities of each department to prepare for supporting the factory audit.
• Supporting the calibration equipment test, documentation and standards in during the audit and according to the requirements of standard.
4. Cost down Project
•I’m a center cost down project. Normally, part changes are received from developer. Therefore, I will have to check and determine whether or not it is related to air conditioning requirements.
•If applicable must submit the test according to the relevant topics and standards.
•After having the evaluation or test results must notify the competent authority of each country upon acknowledgment and approval.
กรกฎาคม 2558 ถึง เมษายน 2560
Regulatory Copliance Engineer and Customer service
Sony Technology(Thailand) Co.Ltd.,, Chonburi, Thailand
700/402 Don Hua Lo Chon Buri; Eastern Thailand; Postal Code: 20000
สำหรับสมาชิกเท่านั้น
1. Regulation submission for apply certification approval products to each country. Consulting and checking the product compliance and international regulation issues. The countries under my responsibility there are 7 continents as follow;
1.1 Asia 1.2 North America 1.3 South America
1.4 Latin America 1.5 Europe 1.6 Australia 1.7 Africa
2. Prepare application and support to ship sample models to test in foreign and communication resolve issues with these companies and lab
test until get the certificate approval before online judgment.
3. Control schedule for certification approval before Online-judgement and Mass-Production.
4. Check and confirm about Safety, EMC and RF test report for oversea before issued and apply to each country.
5. Check and confirm 1st lot inspection for Mass-production and shipping judgement.
ประวัติการฝึกอบรม
ตุลาคม 2564 ถึง ตุลาคม 2564
Electrical and Electronics Institute
EMC (Electromagnetic compatibility)
กรกฎาคม 2563 ถึง กรกฎาคม 2563
At Daikin Industries(Thailand
-Product and marketing situation
มีนาคม 2563 ถึง มีนาคม 2563
๊UL Labolatory
ASEAN, North America and Middle East regulation situation update