AIS SDH equipment Project phase 2010-2013, Bangkok
- Use Auto CAD program to storage and manage drawing (Site location, Floor layout, Equipment bay face, Transmission and power system cable wiring, Transmission and power system diagram) of exchange and base station.
- Make Approve Installation drawing and As-built Drawing.
- Make site folder document, Survey report and Installation report.
- Survey site and prepare materials for installation NEC SDH equipment.
- Use OSP insight program to bring the communications wiring data to complete the Preliminary Acceptance Test (PAT) report.
RRD Myanmar, NDMO Laos, NCDM Cambodia-JICS (Japan International Cooperation System) Project
- Travel to Myanmar, Laos, Cambodia for survey and prepare materials of the network and monitoring system installation support the Information and Communication Technology of National Committee for Disaster Management.
- Make Approve Installation drawing and As-built Drawing.
- Make Survey report and Installation report.
NEC-MPT (Myanmar Post and Telecommunication) Project Support 27th SEA games
- Travel to Yangon, Myanmar for survey the installation of antenna, tower, communications equipment and cable system wiring such as 4GLTE, Backbone/Metro Network
- Make Approve Installation drawing and As-built Drawing.
- Make Survey report and Installation report.