1. Discuss new models with customers and APQP team. Get DWG and Specify Criteria standard by customer.
1.1 Make Plan New Product Feasibility on plan Review Commitment. and plant testing and sample.
2. Testing product and sample new model part and setting standard product and machine Follow is according customer Requirement.
2.2 Within the team APQP action on plan Feasibility and Risk, Making Document WI, QP (PPAP, Control Plan, FMEA, MSA, PSW, Testing Report.)
2.3 Training Employee about SC point and Q-Point, Master part approve, Data Check sheet of new product.
2.4 Risk Analysis Quality Assurance of product new model and product in organization.
3. Support Audit new model until approve produce by customer, Follow up New Product Feasibility on plan.
4. Design the system Quality assurance according IATF 16949 is Assistant QMR Quality System and QC Tools for analysis.
5. Discuss Management Review with QMR. And Discuss with group internal Auditor.
6. Plan Internal audit schedule 3 plant and auditor, And support Audit annual of CB.
7. Support analysis about customer complaint, Reply analysis about problem too report 8D.
8. Support tools and equipment Laboratory Calibration.
9. Making and design operator Quality procedure document.
10. Send Permanent countermeasure and evidence to customer.
11. Follow up action Customer complain, Follow up and action NCR in organization shall.
12. Development Supplier and audit annual year.
มกราคม 2558 ถึง สิงหาคม 2561
Qc Engineer
Fuji tusco group
นิคมอตุสาหกรรมบางปู
สำหรับสมาชิกเท่านั้น
1.Meeting Join customer set accept criteria.
2.Dimenstion inspection All transformer steel and part assemble.
3.Testing too line welding Nitrogen Prussuer transformer.
4. Testing Vacuum mainthank transformer.
5. Spray test a welding.
6. Visual Check welding.
7. Check the size of the weld line.
8.Test part assemble steel of the transformer.
9.Engineering final inspection report.
10. Follow NCR in production and countermeasure.
11.Set the check list final inspection transformer befor delivery.
12.Set Schedule inspection check to supplier befor work in process line production.
13.Set the Manual assemble the nut, screw, washer of the transformer.
14.Group leader kaizen Aectivity.
15. Internal audut ISO: 9001
มกราคม 2559 ถึง มกราคม 2561
QA Suppervisor
Thai ho cheng packgaging
นิคมอตุสาหกรรมบางปู
สำหรับสมาชิกเท่านั้น
1.meeting Join customer set accept criteria before production.
2.testing newmodel sent custormer accept.
3.setup limet semple of the product.
4. Training production staff and the Qc staff limet of the new product.
5.set up the check list of new product.
6.follow Week report of the product NG.
7.follow the custormer complain of produt.
8.Respond to customer complaints (countermeasure)
9.fectory meeting week customer complan product.
10. Set certificate for product of material.
10. Control calibetion measuring instrument.
11.Internal audut ISO :9001