- Production planning
- Track materials and equipment for production
- Check quality before delivering to customers
- Improve work methods that encountered problems in both documentation and operations, including organization.
Create a document system for use in work
-Summary of production results Menstruation and problems occurring during the month to be analyzed and solved.
ตุลาคม 2565 ถึง มกราคม 2567
Assistant manager
Glasten.Co.,Ltd
Saimai
สำหรับสมาชิกเท่านั้น
- Production planning
- Check quality before delivering to customers
- Improve work methods that encountered problems in both documentation and operations, including organization.
Create a document system for use in work
-Summary of production results Menstruation and problems occurring during the month to be analyzed and solved.
ตุลาคม 2564 ถึง กันยายน 2565
Ass't Manager
Fabriq corporation .co., Ltd ( C.N. Progess Inter Group )
Saimai
สำหรับสมาชิกเท่านั้น
- Plan & Control for the production line in factory
- Review customer assignment and prepare documents for production
- Prepare nc program for cnc machine
- Ensure quality control during production
- Check and control the quality of work before sending to customers
- Plan delivery
Responsibility of System development
- Improve the work method system, find the point that needs to be corrected
for production.
- Specify STD.TIME for the work schedule for production.
ก.ค. 48 - มี.ค. 56 (7 ปี 9 เดือน)
TS. INTERTECH Co.,Ltd. ( Thai summit Group )สมุทรปราการ
ประเภทของธุรกิจ: ยานพาหนะ/อะไหล่
ธุรกิจของบริษัท: (Manufacturing of Product by Die for Press Part )
จำนวนพนักงาน: 1000 คนขึ้นไป
ตำแหน่งล่าสุด: Project Engineer
ตำแหน่งเทียบเท่าในตลาด: วิศวกร : Project Engineer
ประเภทของงาน:งานประจำ
เงินเดือนล่าสุด: 28,000 บาท ต่อเดือน
ความรับผิดชอบ: - Making Die Manufacturing for new project in order to control each section.
- Review customer assignment and prepare documents for making tooling to
each concerned section.
- Trial sample part and keep data for improve ,know how , knowledge.
- Purchase standard parts and accessories by refer with part list details.
- Conduct the meeting to in corporate solution for solve problem in case of
mistake from customer or mistake from our concerned section.
- Sending inspection to QA. section for check after try out completed.
- Prepare & combine final document for sending to customer after buy off die
finished
******************************************
August 3, 2004 – June 25, 2005
REHAU Co.,Ltd
(Manufacturing of Product by Plastic & Rubber )
Position – Technical Draftman.
Responsibilities
- Drawing product required by the company and department.tabtabtabtabtabtab
- Design & Drawing Jig & fixture
********************************
October 8, 2002 – June 14 2004
D.T.C. Industries Public Co.,Ltd.(ISO 9001:2000 Certified )
(Manufacturing of Writing Instruments & Office Supplies under Lancer Brand)
Position – Draftman.
Responsibilities
- Design & Dawing product required by the company and department
- Check and prove drawing sending by the supplier.
ประวัติการฝึกอบรม
พฤษภาคม 2547 ถึง พฤษภาคม 2547
Solidworks Training Course at Applicad Training Center.