Company : PTT EP
Project : ART PV Internal Inspection
Position : UTM Level II
Responsibility : - Visual / UTM Inspection on the Pressure Vessel
-Performed NDE on the equipments such as UTM , MT and PT.
Company : NTS
Project : Nong Yao WPP-A,WHP-B Bundle Modification
Position : MT, PT Level II
Responsibility : -Performed NDE on the equipments such as MT , PT
Company : PTT EP
Project : GBS Partial Shutdown 2020
Position : UTM Level II
Responsibility : - Visual / UTM Inspection on the Pressure Vessel
-Performed NDE on the equipments such as UTM , MT and PT.
Project : Turnaround VCM 1 (2019)
Position : Inspector
Responsibility : - Visual / UTM Inspection on the Pressure Vessel
-Performed NDE on the equipments such as UTM , MT and PT.