Work Experience
Date: March 2018 - March 2020
Site : Esso Sriracha Refinery
Project: Maintenance Esso Refinary
Position : Planner / Engineer
Job Description
1.Plan Working Scope Remove and Installation Piping and Structure Gas and Petrochemical in Esso Sriracha Refinery
2.site survey Esso Sriracha Refinery for working scoping maintenance of Piping and Structure
3.draft drawing to do Auto CAD program for to fabrication go to Shop Laem Chabang CKC
4.plan working scoping to field supervisor for maintenance to Piping and Structure
5.Send work reports scope Remove and Installation Piping ,Structure to Construction manager CKC and Owner Planner Esso Sriracha Refinery for acknowledgment.
6.Send invoices to customers for billing
Work Experience
From Site Thai oil Sriracha Refinery
Date March 2021 - Present
Project 30- SBM-1 Onshore line Project SBML
Position Field Engineering
Job Description
1.Prepare Document Drawing to field work for Supervisor and Forman
2.Support Equipment hand tool , Crane , Haib , Car in the field for Team Field Supervisor and Forman to work without problems.
3.Explain the work to the Supervisor and foreman team to understand and to avoid accidents by Safety tock in the morning so that everyone works recklessly. Wear PPE equipment strictly in accordance with the requirements of the refinery.
4.Solve problems working with other companies without obstructing each other's work. to work in tandem
5.Contact the owner of the area. Operator Thaioil while the site has a problem to fix the work to continue working.
6.Send work progress report via E-mail to Construction manager and Team Engineer , and Owner Thai oil every day.
7.Plan the work that will be done next week for the Team Field Supervisor and Foreman to know and understand every Friday.in order to have no problem starting work next week
1.Control systems and equipment installed within the building.
2. Check and repair and maintain equipment in the building according to the work plan.
3. Record the inspection and maintenance of the equipment as assigned.
4. Take note of the use of electricity and water supply.
5. Coordinate with other building staff
6. Prepare for emergencies at all times