- Support Fin coating line (FCL) & Fin Slitter Ling (SFL) For Aluminum Fin Coat and AutoFin
(Denso).
- Support all production activity.
- Control production and production according to the plan set up by the department.
- Production machine and equipment improvement.
- Process Improvement for maximum efficiency in both quantity and quality.
- Preventive maintenance
มิถุนายน 2560 ถึง พฤษภาคม 2561
Maintenance Engineer
IHI ASAI-PACIFIC (Parking System department as Project Site Engineer)
- Install, commission & maintenance of Automatic Parking system.
- Solve the problems on technical issues at the job site. (Standby Emergency call 24hr.)
- Planning and management installation teams and resources.
- Inventory, Material and Logistic Management.
- EHS Management.
- Participated in Project The loft Asoke (High Rise Tower Parking System 83 Meters 210 lots)
- Building Engineer at viphavadee hospital.
- Troubleshooting and repairing malfunctions in electrical, mechanical systems and other
hospital equipment.
- Planning & Control daily operation. (Standby Emergency)
- Supporting Technical Services, as required, with proactive inspection.
- Energy Planning & Control.
- Planning and management Repair job.
King mongkut's institute of technology ladkrabang prince of chumphon campus April 2015 December2015
Job Scope - Teaching assistant (TA)
Subject : Mechanical Drawing ,Workshop and Engineering Practice.
Work whit Automotive Club KMITLPCC & Kasetsart U. (Formula Student Racing Car) Since 2012 to Present - In 2015: Kasetsart U. join JSAE competition at ECOPA Stadium, Shizuoka JAPAN (Service Team)
- In 2014- present: KMITL and KMITL PCC team advisor (suspension and engine tuning) - In 2013: Team captain, drivetrain design chief, parts machining chief, engine tuner, and driver.
INTERSHIP WITH PROVIDE ENGINEERING CO., LTD.
- In 2014 trainee maintenance engineer.