1. Demolishing the Chemical plant and handover of machines to the buyer
without injury or accident in 1995
2. Finding a solution to control the oil loss by initiating the Ship pipeline
stripping in 1998 that can achieve an additional 3,000 ltrs. Of oil.
3. Coordinate and support the engineering team to do the VRU project
In 2001 which was completedwith no accidents.
4. Developing the transport contractor on road transport operation to be
professional haulier in 2004
5. Being a team member to implement the Fuel save project successfully and
improve fuel consumption from 3 km/ltr. to 5 km/ltr.
6. Reduce the fuel contamination while unloading the fuel at service station by
using the strategy of walk and talk during operation.