support customers in terms of technical information on additives or formulations for finish oil. If the customer has a problem with formulation or finish oil appearance, I have to consult with an additive supplier to solve the issue or contact to a laboratory doing handblend to find out the problem. I also arrange the registration document. Maintain effective business relationships with an existing and prospective customer
Feasible study on electricity generation by using turbine to recover energy from pressure reducing valves because there is energy loss due to pressure difference across the pressure reducing valve. That pressure loss is recoverable and can be used to generate electricity through a generator. The second work is to design a heat exchanger for heat recovery from unconverted oil rundown in Hydrocracking Unit to reduce the fuel consumption which is used to increase the temperature on the cold side and reduce energy consumption which is used to reduce the temperature on the hot side.
มิถุนายน 2562 ถึง กรกฎาคม 2562
Production Engineering (Internship)
PTT Public Company Limited. Rayong Gas Separation Plant, Rayong, Thailand
555 ถ.สุขุมวิท มาบตาพุด เมืองระยอง ระยอง 21150
สำหรับสมาชิกเท่านั้น
- Classify the type of work from the Hazard and Operability Study Report's recommendation.
- Calculate whether the safety valve sizes are sufficient for handling various scenarios such as fire case, reflux failure, blocked discharge and excessive heat input.