Improved and developed processes to achieve KPI target and reduced the loss in the processes
Designed the processes to be compatible with the existing machines
Collaborate with Production team for processing new products trial run
Collaborate with Engineering team for machine improvement
Improved and developed processes to achieve KPI target and reduced the loss in the processes
Designed the processes to be compatible with the existing machines
Collaborate with Production team for processing new products trial run
Collaborate with Engineering team for machine improvement
Managed production capability to match with production plan
Planned the productivities in order to balance the production target with the plant capacity
Production daily management
an 2011 Apr 2012 Process Control Engineer (Mixing), International Laboratories Co.,Ltd. , Bangkok
Controlled the production in toiletries, hair care ,skin care and cologne products to comply with GMP
Managed production capability to match with production plan
Planned the productivities in order to balance the production target with the plant capacity
Production daily management
Manage cost saving project : Lessen the Mixing Time for Cologne Products
[Mixing Time of Selected product is 40% lessen and deliver cost saving up to 193,750 baht/ year]
Feb 2010 Dec 2010 Process Development Engineer (Mixing), International Laboratories Co.,Ltd. , Bangkok
Improved and developed processes to achieve KPI target and reduced the loss in the processes
Designed the processes to be compatible with the existing machines
ประวัติการฝึกอบรม
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดี)
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดี)
ไทย คำ/นาที อังกฤษ คำ/นาที
รถยนต์ ,
รถยนต์ ,
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
International Laboratories Co.,Ltd. , Bangkok
Manage cost saving project : Lessen the Mixing Time for Clear Shower Products (Soap Base)
[Mixing Time of Selected product is 33% lessen and deliver cost saving up to 4,000 baht/batch]
Manage new product deployment and productivity improvement : Petal type bead
[Bead Forming Time of Selected product is 70% lessen]