Duties and Responsibilities : Preparation and developing all associated specification such as Material, Drawing, Method of Statement, Inspection Test Plan & Check List and follow up all document status prior to all relevant task related to Mechanical / Plumbing works in the Buildings such as HVAC, Sanitary System, Drainage System, Fire Protection System, Plant Room etc., In addition, to liaison other parties prior to inspection, tracking the installation and maintain all measuring certification document including.
Responsibilities CONSTRUCTION ME WORK.
-Installation HVAC System
-Installation Chiller , Cooling Tower , Chilled Piping system
-Installation VRV , VRF and Split type System
-Installation Ventilation and Fres air system
-Installation Duct work (SAD,RAD,EAD,FAD,KED)
-Installation Sanitary And Plumbing system
-Installation fire protection system
-Estimate.
สิงหาคม 2556 ถึง มกราคม 2561
Senior Project engineer/Senior. M&E Engineer ( HVAC ,SANITARY, FIRE PROTECTION,Electrical, Design wo
Duties and Responsibilities : Preparation and developing all associated specification such as Material, Drawing, Method of Statement, Inspection Test Plan & Check List and follow up all document status prior to all relevant task related to Mechanical / Plumbing works in the Buildings such as HVAC, Sanitary System, Drainage System, Fire Protection System, Plant Room etc., In addition, to liaison other parties prior to inspection, tracking the installation and maintain all measuring certification document including.
Responsibilities CONSTRUCTION ME WORK.
-Installation HVAC System
-Installation Chiller , Cooling Tower , Chilled Piping system
-Installation VRV , VRF and Split type System
-Installation Ventilation and Fres air system
-Installation Duct work (SAD,RAD,EAD,FAD,KED)
-Installation Sanitary And Plumbing system
-Installation fire protection system.
-Installation utility system supply to machine
-Estimate.
มกราคม 2555 ถึง กันยายน 2557
Senior Mechanical Engineer. (HVAC ,SANITARY, FIRE PROTECTION )
Hitachi plant & technologies Co.,Ltd.
54 B.B building 12th Floor.Room No.1201 Sukumvit Road 21 bangkok.
สำหรับสมาชิกเท่านั้น
Duties and Responsibilities : Preparation and developing all associated specification such as Material, Drawing, Method of Statement, Inspection Test Plan & Check List and follow up all document status prior to all relevant task related to Mechanical / Plumbing works in the Buildings such as HVAC, Sanitary System, Drainage System, Fire Protection System, Plant Room etc., In addition, to liaison other parties prior to inspection, tracking the installation and maintain all measuring certification document including.
Responsibilities CONSTRUCTION ME WORK.
-Installation HVAC System
-Installation Chiller , Cooling Tower , Chilled Piping system
-Installation VRV , VRF and Split type System
-Installation Ventilation and Fres air system
-Installation Duct work (SAD,RAD,EAD,FAD,KED)
-Installation Sanitary And Plumbing system
-Installation fire protection system.
-Installation utility system supply to machine
-Estimate.
Position : Project Engineer (Clean room Specialty, HVAC ,SANITARY, FIRE PROTECTION,Electrical)
Period of work : 8/02/2009 - 30/12/2011
Duties and Responsibilities : Preparation and developing all associated specification such as Material, Drawing, Method of Statement, Inspection Test Plan & Check List and follow up all document status prior to all relevant task related to Mechanical / Plumbing works in the Buildings such as HVAC, Sanitary System, Drainage System, Fire Protection System, Plant Room etc., In addition, to liaison other parties prior to inspection, tracking the installation and maintain all measuring certification document including.
Responsibilities CONSTRUCTION ME WORK.
-Installation HVAC System
-Installation Chiller , Cooling Tower , Chilled Piping system
-Installation VRV , VRF and Split type System
-Installation Ventilation and Fres air system
-Installation Duct work (SAD,RAD,EAD,FAD,KED)
-Installation Sanitary And Plumbing system
-Installation fire protection system.
-Installation utility system supply to machine
-Estimate.
Position : Project Engineer (HVAC SYSTEM, Chiller Plant.Cooling tower plant.)
Period of work : 1/01/2004 - 7/02/2009
Duties and Responsibilities : Preparation and developing all associated specification such as Material, Drawing, Method of Statement, Inspection Test Plan & Check List and follow up all document status prior to all relevant task related to Mechanical / Plumbing works in the Buildings such as HVAC, Sanitary System, Drainage System, Fire Protection System, Plant Room etc., In addition, to liaison other parties prior to inspection, tracking the installation and maintain all measuring certification document including.
Responsibilities CONSTRUCTION ME WORK.
-Installation HVAC System
-Installation Chiller , Cooling Tower , Chilled Piping system
-Installation VRV , VRF and Split type System
-Installation Ventilation and Fres air system
-Installation Duct work (SAD,RAD,EAD,FAD,KED)
-Estimate.
6. ประสบการณ์ทำงาน
Company : Secco Engineering QATAR LLC. (QATAR)
Address : P.O.BOX.30727 DOHA, QATAR.
Position : Senior Mechanical Engineer (HVAC. ,SANITARY, FIRE PROTECTION SYSTEM)
Period of work : 1/01/2007 - 30/12/2009
Duties and Responsibilities : Preparation and developing all associated specification such as Material, Drawing, Method of Statement, Inspection Test Plan & Check List and follow up all document status prior to all relevant task related to Mechanical / Plumbing works in the Buildings such as HVAC, Sanitary System, Drainage System, Fire Protection System, Plant Room etc., In addition, to liaison other parties prior to inspection, tracking the installation and maintain all measuring certification document including.
Responsibilities CONSTRUCTION ME WORK.
-Installation HVAC System
-Installation Chiller , Cooling Tower , Chilled Piping system
-Installation VRV , VRF and Split type System
-Installation Ventilation and Fres air system
-Installation Duct work (SAD,RAD,EAD,FAD,KED)
-Installation Sanitary And Plumbing system
-Installation fire protection system.
-Estimate.
7. ประสบการณ์ทำงาน
Company : NATAWAN OBAYASHI + NANTAWAN MARUSE Co.,Ltd. (Thailand.)
ระบบปรับอากาศและระบายอากาศ (air-conditioning and ventilation system)
มิถุนายน 2552 ถึง มิถุนายน 2552
NEW DOHA INTERNATIONAL AIRPORT
Fall Prevention / Protection Procedure.
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (ดี) เขียน (พอใช้)
ไทย 30 คำ/นาที อังกฤษ 30 คำ/นาที
รถยนต์ ,
รถยนต์ ,
สามารถใช้ program excell , word , CAD
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
1.BANKOK HOSPITAL
2.LAUNGSUAN VILLEAG
3.NEW DOHA INTERNATIONAL AIRPORT (QATAR)
4.RAMA HOTPITAL
5.THE RIVER CONDOMINIUM.
6.SIAMKEPENSAKI HOTEL
7.SANAMBINNAM CONDOMINIUM
8.CENTRAL WOLD
9.HANSA RESIDENCE HOTEL
10.ROBINSON SUPHANBURI
11.CENTRAL WONGAMART CHONBURI
12.HISADA NEW FACTORY
13.KASUMI NEW FACTORY
14.SANKO ELECTRIC NEW FACTORY
15.Y-TECH NEW FACTORY
16.YS-TECH NEW FACTORY