Injection Technician, Technical Mold Setup, Die Setter
25,000บาท ขึ้นไป
13 ส.ค. 2562
13 ส.ค. 2562
ตำแหน่งที่สนใจ
Injection Technician, Technical Mold Setup, Die Setter
ประวัติการศึกษาสูงสุด
จบการศึกษาแล้ว ในปี พศ. 2552
ปวส. Bankhai Technical College, Thailand
High vocational
Technical of Product
3.32
ปวช Map ta Phut Technical College, Thailand
Vocational
major Instrumentation and Maintenance
3.08
ประวัติการทำงาน
0 ปี
ไม่ได้ระบุ
Technical Injection
Fisher & Paykel Appliances (Thailand) Co., Ltd.
7/252, 7/282 Moo 6, Amata City Industrial Estate, Mapyangporn, Plaukdaeng, ระยอง 21140
สำหรับสมาชิกเท่านั้น
-Maintain Injection machine and equipment related plastic injection.
-Change mold and equipment when production schedule changed.
-Install condition value of injection machine schedule changed.
-Request material that used in production line keep. Send back when injection process finished.
-Firstly correct the problem of injection machine and equipment when production problem occurring.
-Maintain and clean mold while manufacturing.
-Install robot for supporting of production.
-Maintain robot to be ready in use.
-Maintain and perform as the company policy and rule strickly.
-Others as Superiors demand.
กันยายน 2554 ถึง เมษายน 2556
Technical Injection
Electrolux Co,Ltd , Rayong , Thailand
169-169/2 Rayong Indusial Land, Ban Khai T. Nonglalok Ban Khai,Rayong ระยอง 21120
สำหรับสมาชิกเท่านั้น
-Maintain Injection machine and equipment related plastic injection.
-Change mold and equipment when production schedule changed.
-Install condition value of injection machine schedule changed.
-Request material that used in production line keep. Send back when injection process finished.
-Firstly correct the problem of injection machine and equipment when production problem occurring.
-Maintain and clean mold while manufacturing.
-Install robot for supporting of production.
-Maintain robot to be ready in use.
-Maintain and perform as the company policy and rule strickly.
-Others as Superiors demand.
Maintain machine and equipment related plastic injection.
: Change mold and equipment when production schedule changed.
: Continually support and follow the quality management system (ISO 9001,TS 16949), ISO 14001 and 5 S activity.