1. Planning manpower working
2. Check and control construction for welding and painting
3. Planning quality control for non-destructive testing (NDT)
4. Planning control structural steel installation work.
5. Coordinate with (PTT ME) about
5.1. Quality checking structure
5.2. Quality checking panting
5.3. Welding Inspection