1. Electrical site control and quality control for sub contractor, recheck of defect work and completion to hand over to customer.
2. Site control to installation had to corrective follow shop drawing, site coordinate to sub contractor, order material on site.
3. Make estimation and BOQ, control cost and budget, material control.
4. Site control report and control progress done complete follow schedule.
5. Make shop drawing and as-built drawing
6. Completion document report and completion hand over.
1. Electrical site control and quality control for sub contractor, recheck of defect work and completion to hand over to customer.
2. Site control to installation had to corrective follow shop drawing, site coordinate to sub contractor, order material on site.
3. Make estimation and BOQ, control cost and budget, material control.
4. Site control report and control progress done complete follow schedule.
5. Make shop drawing and as-built drawing
6. Completion document report and completion hand over.
1. Breakdown material and make BOQ.
2. Request material quotation and specification from supplier.
3. Estimation of Electrical and Communication system.
4. Prepare document for bidding and hand over document to site section.
Self-employed for installation of Electrical and Communication system 3 year. (Oct 2014-Mar 2017)
ประวัติการฝึกอบรม
ธันวาคม 2554 ถึง เมษายน 2555
Sumi cambodia wiring system factorty, Phnom Phenh, Cambodia
Electrical site engineer for project at Cambodia
มกราคม 2552 ถึง มิถุนายน 2552
Sumitomo Densetsu Co., Ltd. at Japan
Trainee Site Engineer for Electrical and Communication System
มกราคม 2549 ถึง มิถุนายน 2549
Sumitomo Densetsu Co., Ltd. at Japan
Trainee Estimate Engineer for Electrical and Communication System