Started Form site preparation work, Surveying work, earthwork, piling work, Infrastructure work, Road work, Soil compaction Test, density Test, CBR. Test, Drainage System work, Including cost estimating the Quantity of Materials Take off for work, excavation and mat FDN, work off the bldg. monitors the activities. Of subcontractor, concrete and rebar Reinforce work, Review progress controller, etc.
4. KSC Construction Co., Ltd.
From: Feb 2011 ‐ Des 2017.
Position: Project Management.
Preparing, Coordinate, Planning Development, Review check and Comment Approved, Interface, Consider QA, QC/Consider Health, Safety & EnvironmentControl.
5. PSA Engineering & Construction Co., Ltd.
From: Feb 2009 ‐ Des 2011.
Position: Project Engineer.
Preparing, Coordinate, Planning Development, Review check and Comment Approved, Interface, Consider QA, QC/Consider Health, Safety & EnvironmentControl.
ประวัติการฝึกอบรม
มีนาคม 2542 ถึง มีนาคม 2542
TECHNICAL COLLEGE CHAIYAPHUM.
ปรับพื้นฐานและเทคนิควิชาชีพ
มกราคม 2550 ถึง มกราคม 2550
สภาวิศวกร
การขอใบอนุญาติประกอบวิชาชีพวิศวกรรมควบคุม
พฤศจิกายน 2560 ถึง พฤศจิกายน 2560
IRPC
SAFETY 50,000 HOUR .
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
ไทย 35 คำ/นาที อังกฤษ 35 คำ/นาที
รถยนต์ ,
รถยนต์ ,
เจระจาต่อรองเกี่ยวกับงาน
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
1.PTTUT ‐ CAP (II) โรงไฟฟ้าหน้าสวนพระเทพฯ จังหวัดระยอง
2.โครงก่อสร้าง central Rayong.
3. PTT LDPE โครงการก่อสร้าง โรงผลิตเม็ดพลาสติกใน นิคมอุสาหกรรมมาบตาพุด
4. Metro rail depot in Bangladesh.