Engineering section control
Maintenance Control
- Reduce NG Plan.
- Leader CCCF
- Leader 3Q6S
- Contact supplier.
- PM Plan
- Improvement process and line layout for productivity up and control quality. Reduce NG part from process.
- Create KAIZEN for production department.
- Packing design and Drawing by auto cad.
- Study and create standard time.
- Improvement the JIG for production.
- Improvement process and line layout for productivity up and control quality. Reduce NG
part from process.
- Create KAIZEN for production department.
- Manufacturing Control.
- Temporary packing design.
- Study and create standard time.
- Solve problem for part shortage.
- Repacking control.
- Improvement the JIG for assembly.
- Making STD time for production assembly.
- Making X-R Chart graph.
- Improvements door lock assembly process for productivity up.
- KAIZEN collect and type classify A, B and C for solve problem again.
- MPW team
a. Line layout U type to I type changing.
b. Preparing manufacturing document.
c. Making table to support part server into assemble line for reduce distance & time.
d. Reduce stock for support pull system.
e. Create STD Time by MTM (Methods-Time Measurement)
U-TAH Co., Ltd. [Mar.2006-Mar.2007]
Position: Production Engineer
- Create BOM for production department.
- Time study welding process.
- Time study painting process.
- Factory production layout Design
ประวัติการฝึกอบรม
เมษายน 2547 ถึง เมษายน 2547
IDS Joint Venture
Safety First
มีนาคม 2548 ถึง มีนาคม 2548
Thaisilp Arkane import Export
Lean Development Program
มิถุนายน 2550 ถึง มิถุนายน 2550
TOP MC Co., Ltd.
ISO/TS 16949, ISO/TS 16949 Internal audit
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (ดี) เขียน (ดี)
พูด (ดี) อ่าน (ดี) เขียน (พอใช้)
ไทย 35 คำ/นาที อังกฤษ 33 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,รถจักรยานยนต์ ,
- Solid work
- Auto cad
- M/S office
- เล่นดนตรี ร้องเพลง
- เล่นกีฬาฟุตบอล
- ซ่อมคอมพิวเตอร์ เครื่องใช้ไฟฟ้า