Priority accountability
- Responsible to manage all engineering activities relating to waste water treatment plant and Detail Design, Fabrication, Procurement, Construction, Installation and Commissioning activities to ensure are performed in accordance with design
- Support technical information advice related to wastewater treatment for all projects. Acts as a focal point, to provide advice either personally or in conjunction with discipline engineers.
- Manage planning and control waste water treatment programs for waste water treatment projects.
- Directs and manages the preparation of feasibility study and conceptual design, FEED and Detailed engineering by consultants for works that have a process, mechanical, instrument/control, structural and electrical content for support waste water treatment plant.
- Control cost of waste water treatment department to meet Company requirements.
- Manage and control department performance to meet the standard of EHS, ISO standard system, 5S, KAIZEN, customers’ standard and any assigned standard according to company policies.
- Review or take part towards HAZOP, Project Safety Plan, Technical Audits and Value Engineering during various phases of Projects.
- Ensure to maintain “safe systems of work” and “safe conditions” are in place with area of responsibility.
- Initiate and develop process efficiency and cost reduction from upstream to downstream.
- Other task will be assigned by management team.
Project Policies, Procedures and Systems
- Reduce waste water trip send out to other site or other disposer.
- Control waste water quality after treat below run off water standard as Thai regulation.
- Verify and check that all the cross contamination not affect to the environmental.
- Recommend improvements to departmental procedures and implement instructions and controls covering a specific area of activity so that relevant procedural/legislative requirements are fulfilled.
-
Budget and Plans
- Assists in the preparation of engineering components of project budgets to facilitate the preparation and presentation of the complete Budget for management approval.
- Monitors the financial performance of engineering budgets in order that area of unsatisfactory performance are identified and rectified promptly.
- Develop, configure and optimize industrial processes from inception through to start up
and certification.
- Develop best practices, routines and innovative solutions to improve production rates
and quality of output.
- Manage cost and time constraints.
- Provide process documentation and operating instructions.
- Provide Process design of Power plan such as P&ID, Boiler package.
- Provides Chemical Process Equipment, Power process and Technical clarification with
Owner and Vendor also.
- Overseeing the construction of new Power plant.
- Purchasing and installing Boiler and Deaerator equipment.
- Scheduling and coordinating work to tight deadlines and within financial budgets.
- Liaising with installation/project engineers and specialists.
- Ensuring safe working conditions and compliance with health and safety legislation.
กรกฎาคม 2554 ถึง พฤษภาคม 2556
Quality Engineer
Yokohama Tire Manufacturing (Thailand) Co., Ltd.
Map Yang Phon, Pluak Dang District, Rayong 21140
สำหรับสมาชิกเท่านั้น
- Work in Quality Engineer support in mixing production.
- Have responsibility in control quality product and control damage in Mixing
Department.
- Responsible for ensuring proper implementation of quality standards and procedures to
continuously assure raw material, in process material, auxiliary and support material and
compound quality.
- Act as the overall document controller in Mixing Department.
ประวัติการฝึกอบรม
ธันวาคม 2555 ถึง ธันวาคม 2555
Wise Management & Consultant Co.,Ltd.
Potential Failure Mode & Effects Analysis (FMEA)
กันยายน 2555 ถึง กันยายน 2555
Professional Safety Institute,Thailand Professional Safety, Environment, Health ,Pinthong Group
Safety Officer, Supervisor Level
มีนาคม 2550 ถึง พฤษภาคม 2550
บริษัท เอเอสเอ บ๊อกซ์บอร์ด คอนเทนเนอร์ จำกัด
ฝึกงาน
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (ดี) อ่าน (ดี) เขียน (ดี)
ไทย 35 คำ/นาที อังกฤษ 35 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,
Wastewater Treatment (Chemical Treatment Technic) and have the wastewater treatment control license.
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
- Journal Articles: Akekasit Eiadpum, Savitree Limtong, Muenduen Phisalaphong.
High-temperature ethanol fermentation by immobilized coculture of Kluveromyces
Marxianus and Saccharomyces cerevisiae. Biochem. Eng. J.,114(2012) 325-329.
- Conference Proceeding: Ethanol productivity form sugarcane juice and cane molasses
by mixed cultures of Kluveromyces Marxianus DMKU 3-1042 and Saccharomyces
cerevisiae M30. The 16th ASEAN Regional Symposium on Chemical Engineering
(RSCE 2009). December 01-02, 2009, at the University of Santo Tomas,
Manila Philippines.
- Conference Proceeding: Ethanol productivity form sugarcane juice by immobilized
Kluveromyces Marxianus DMKU 3-1042. An international conference on
Chemical & Biomolecular Engineering. January 28-29, 2010,
National University, Singapore.
- Received Second Best Poster Presentation Award from the 16th ASEAN Regional
Symposium on Chemical Engineering.
- Chemical Engineering In-House Practical Training Petrochemical Analysis
at Department of Chemical Engineering, Prince of Songkla University.