1. Working Experience: Acting Technical Support Engineer
01/2016 08/2017
Project: Engineering, Procurement, Construction and Commissioning of 200,000 LPD Ethanol Plant (Phase I) in Chachoengsao, Thailand
Main Accountabilities of Technical Support & Utility Service Engineering Work in Ethanol Plant:
o Plan the Maintenance Department in Accordance with the Company's Policies and Plans
o Define the Procedures and Procedures of the Maintenance Department.
o Supervise and Monitor the Performance of the Mechanical Agency.
o Planning Maintenance Electrical Measuring Instrument Preventive Maintenance
o Control and Maintenance of Machinery, Electrical Systems, Instrumentation and Equipment, Prevention and Maintenance. According to the Guideline Given
o Summary of Monthly / Quarterly Preventive Maintenance Reports.............
o Analyze the Causes of Problems with Machinery, Electrical Systems, Instrumentation and Equipment. and Find ways to Coordinate with External Service Providers to Analyze Solutions for new Symptoms that Never Happened Before.
o Supervise the Testing of the use of Machinery, Electrical Systems, Instrumentation and Equipment.
o The Maintenance has been Completed to Maintain the Normal use. Manages the Team of Maintenance Technicians to work with the Professional Maintenance System to Control the Operation of the Team Professionally. Improve Equipment Reliability to Make Production Processes and Utility Systems Work Efficiently.
o Together with the Engineering Team to Communicate. Coaching for Maintenance and Maintenance of Machinery is done by Engineering Standards with the Right Skills. Properly Lead a Maintenance Technician Team to Perform Engineering Work in Strict Compliance with Safety Rules.......
o Do not Neglect Safeguards Such as Compliance. LOTO, Risk Prevention Measures as Assessed in the Work Permit and Hot Work Permit, Safe Working Measures, High Working Measures, Electrical work measures, measures In dealing with acid and chemicals within the factory, etc.
o Lead a Team of Maintenance Technicians to Perform Engineering Work in Accordance with the Company's Engineering Standards Strictly
2. Working Experience: Acting Engineering Manager
08/2014 08/2017
Project: Engineering, Procurement, Construction and Commissioning of 200,000 LPD Ethanol Plant (Phase I) in Chachoengsao, Thailand
Main Accountabilities of Acting Engineering Management Work:
o Acting as a Design Specialist - Installing Project Engineering and other Ethanol Plant Projects Under the Supervision and Responsibility of the Instrument, Civil, Electrical and Project Documentation
a) Process Systems
b) Mechanical & Piping System
c) Civil/Building / Structure
d) Instrument / Automatic Equipment System
e) Electrical System
f) Vendor Document Controller of Project
3. Working Experience: Mechanical & Piping Engineer / Acting Process Engineer / Acting Site Engineer
02/2012 08/2017
Project: Engineering, Procurement, Construction and Commissioning of 200,000 LPD Ethanol Plant (Phase I) in Chachoengsao, Thailand
Main accountabilities of Mechanical & Piping / Process and Site Management Work:
o Focal Person for Engineering Works at Site, Responsible for Coordination Between Site, KL & Bangkok Office
o Coordinates all Engineering Activities Related to Piping& Mechanical Scope and to Make Sure to Meet Project Deliverables.
o Equipment / Rotating (Mechanical) Design and Piping Design for Ethanol Process Systems (Plant) and Preparation/Review Engineering Documents, Including Work P&ID, PFD, Vendor drawings, piping plan, piping isometrics, equipment general arrangement, equipment detail drawings etc.
o Make sure at site drawings using for construction are latest and approved.
o Ensure construction works at site were carried according to codes and standards.
o Ensures vendors and subcontractors adhere to project technical requirements and job Specifications.
o Participates in client/contractor meetings and resolves client and management issues related to engineering.
o Assists in the preparation of engineering project proposals
o Design Piping and Process System (OSBL) to the Design & Detail Engineering Work and Preparing the Engineering Documents
o Design Piping and Process System (ISBL) to the Design & Detail Engineering Work and Preparing the Engineering Documents (Licensor: KATZEN International, Inc.)
o Piping General Arrangement Layout Design Assembly Design & Drawings
o Piping Support Design Detail & Drawings
o Piping Isometrics Detail & Drawings
o Piping Size Design Calculations
o Prepare Key Plan, Plot Plan and Equipment Layout
o Prepare Piping and Bulk Material Take-Off and Bill of Material
o Prepare Data Sheets, Specifications & Requisitions for Piping Bulks and Perform Vendor of Review
o Technical Bid Evaluation, Carryout Vendor Drawings / Documents Review and Vendor Data Incorporation
o Review Piping Specification, Standards and Design
o Co-Ordination with Other Disciplines
o Tankage / Column / Heat Exchanger / Pressure vessel / Equipment to the Assembly Design & Drawings
o Tankage / Column / Heat Exchanger / Pressure vessel / Equipment to the Detail Design & Drawings
o Tankage / Column / Heat Exchanger / Pressure vessel / Equipment to the Design Calculations
o Procurement Engineering Including Request for Qualifications & Vendor Proposal Review
o Review of Vendor Documents (MDR)
o Quality and Schedule Control of Vessel Fabrication at Vendor Shop
o Co-Ordination with Other Disciplines
o Responsible to Projects From Bidding, Engineering, Procurement and Construction
o Extensive Experience in Estimation, Engineering, Procurement and Construction of Chemical Plant, Oil and Gas Plants, Power Plants Tankage / Column / Heat Exchanger / Pressure vessel / Equipment
o Tankage / Column / Heat Exchanger / Pressure vessel / Equipment to the Design for Chemical Plants, Oil and Gas Plants, Power plants
o Material Take-Off and Order for Tankage / Column / Heat Exchanger / Pressure vessel / Equipment
o Supervise and Control Work at Fabricate Shop
o Prepare Sub-Contractor Construction Scope of Work
o Provide Clear Direction and Input During the Selection of Rotating Equipment, Assisting the Project Manager
o Detailed Involvement in the Procurement, Installation and Commissioning of Rotating Equipment
o Provide Technical Advice and Support to the Assigned Team
o Develop Spares Holding Philosophy and Strategy for Critical Rotating Equipment Through Collaborative Effort with the Owner
o Develop and Implement Rotating Equipment Reliability Improvement Plans to Include Proper Start-Up and Shutdown Procedures, Development of Operating Envelopes, Defining Condition
o Monitor Tasks and Machinery Data Review
o Work Closely with the Machinery Specialists, Unit Mechanical Specialists, Unit Maintenance Personnel, Operations, Subject Matter Experts, Performance Unit Rotating Equipment Technical Authority, and Outside Shops as Technical Resources
o Stay Familiar with Operating Asset Maintenance and Operations Site Practices and Personnel
o Ensure that Aramco Standards are Followed During Procurement, Installation and Start-Up of Rotating Equipment
4. Working Experience: Acting Mechanical & Piping Engineer / Process Engineer
02/2015 02/2016
Project: Engineering, Procurement, Construction and Commissioning of 10 MW Waste Energy Power Plant in Saraburi, Thailand
Main Accountabilities of Mechanical & Piping and Process Engineering Design & Drawing Detailing Work:
o Acting as a Design Specialist - Installing Project Engineering and other Waste Energy Power Plant Projects Under the Supervision and Responsibility of the Process, Mechanical & Piping Instrument, Civil, and Project Documentation
a) Process Systems
b) Mechanical & Piping System
c) Civil/Building / Structure
d) Instrument / Automatic Equipment System
e) Vendor Document Controller of Project
Main Accountabilities of Mechanical & Piping Engineering Design & Drawing Detailing Work:
o Prepare / Review and Check for ITB, International Code & Standard
o Preparation for Piping DWG including Plot plan, Piping Plan, General Arrangement DWG, etc.
o Prepare / Review and Check for Information Drawing (Nozzle Orientation, Rack Inform and Civil Inform)
o 3D Model review and tag clear
o RFQ & TBE & Vendor Print Check &Material Take-Off for Piping Material and Special Item
o To Review and Ensure the Quality of Piping Product Field Engineering (Pre commissioning & Commissioning, Field Supervision, Equipment Inspection)
o HVAC and Fire Fighting Engineering Design
o Preparation of HVAC Specification and Control System Drawing
o Active & Passive Fire Protection System Engineering Preparation of Design Philosophy
o P&ID, Layout Drawing, and Hydraulic Calculation for Fire Fighting & Safety Equipment
o Plant Layout, Fire Zone & Emergency Escape Route Planning Fire Risk Analysis and Risk Assessment
1. Working Experience: Acting Lead Mechanical Engineer (Equipment Engineer)
Main Accountabilities of Mechanical Engineering the Design & Drawing Detailing and Site Management Work:
o Tankage / Column / Heat Exchanger / Pressure vessel / Equipment to the Assembly Design & Drawings
o Tankage / Column / Heat Exchanger / Pressure vessel / Equipment to the Detail Design & Drawings
o Tankage / Column / Heat Exchanger / Pressure vessel / Equipment to the Design Calculations
o Procurement Engineering Including Request for Qualifications & Vendor Proposal Review
o Prepare / Review of Vendor Documents (MDR)
o Quality and Schedule Control of Vessel Fabrication at Vendor Shop
o Co-Ordination with Other Disciplines
o Responsible to Projects From Bidding, Engineering, Procurement and Construction
o Extensive Experience in Estimation, Engineering, Procurement and Construction of Chemical Plant, Oil and Gas Plants, Power Plants Tankage / Column / Heat Exchanger / Pressure vessel / Equipment
o Tankage / Column / Heat Exchanger / Pressure vessel / Equipment to the Design for Chemical Plants, Oil and Gas Plants, Power plants
o Material Take-Off and Order for Tankage / Column / Heat Exchanger / Pressure vessel / Equipment
o Supervise and Control Work at Fabricate Shop
o Prepare Sub-Contractor Construction Scope of Work
2. Working Experience: Acting Lead Piping Engineer
Main Accountabilities of Piping Engineering the Design & Drawing Detailing and Site Management Work:
o Piping General Arrangement Layout Design Assembly Design & Drawings
o Piping Support Design Detail & Drawings
o Piping Isometrics Detail & Drawings
o Piping Size Design Calculations
o Prepare Key Plan, Plot Plan and Equipment Layout
o Prepare Piping and Bulk Material Take-Off and Bill of Material
o Prepare Data Sheets, Specifications & Requisitions for Piping Bulks and Perform Vendor of Review
o Technical Bid Evaluation, Carryout Vendor Drawings / Documents Review and Vendor Data Incorporation
o Prepare / Review Piping Specification, Standards and Design
o Co-Ordination with Other Disciplines
Sep 01, 2017 Present
METALSPECT Engineering Co.,Ltd
Head Office 237/11 Village No.14 Rai Khing, Sam Phran, Nakhon Pathom, 73210, Thailand
Position Senior Project & Design Engineer (พก. 468)
Tel / E-mail +664 515-7802 / [email protected], [email protected] Working Experience: Engineer Freelance Engineering consultants provide engineering-related services such as design, supervision, execution, repair, operation, maintenance, technology, creation of drawings and specifications, and make recommendations to companies and industries
Under the supervision of Charter and Fellow mechanical engineers Level II and Level III, control and certify the work
Aug 05, 2002 - Jan 31, 2003
Summit Auto Body Industry Co., Ltd. (SAB)
Head Office 32-33 Bang Na-Trat Rd, Tambon Bang Phli Yai, Amphoe Bang Phli, Chang Wat Samut Prakan 10540, Thailand
Position Mechanical CAD/CAM Draftsman & Designer
Tel / Website +662 338-6000
http://www. summitautogroup.com
Working Experience: Employee must be able to develop process to manufacture sheet metal stampings
Main Accountabilities:
o Employee must be able to develop process to manufacture sheet metal stampings as follows:
Develop blank shape and determine part mass
Develop die layout
Type of die (Progressive Die, transfer die, etc.)
Determine number of stations required to build part
Component Teardown & Assembly BOM Development
Attend customer meetings and customer cost reviews/audits
ประวัติการฝึกอบรม
กุมภาพันธ์ 2552 ถึง มีนาคม 2552
The Engineering Institute of Thailand, Bangkok, Thailand
Boiler & Pressure Vessel & Piping
สิงหาคม 2545 ถึง พฤศจิกายน 2545
Thai-German Institute, Chonburi, Thailand
CAD/CAM Draftsman & Designer
ไม่ได้ระบุ
Council of Engineers, Bangkok, Thailand
Mechanical Engineer
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (ดี) อ่าน (ดี) เขียน (ดี)
ไทย 50 คำ/นาที อังกฤษ 50 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,รถจักรยานยนต์ ,
Experience in Software:
o Auto CAD, Auto CAD Mechanical (2D, 3D)
o CAD Worx (3D Plant, Equipment, P&ID, Steel)
o PVElite & PV Code Calc
o Microsoft Office Program (Excel, Word etc.,)
o COMPRESS Build 6258
o COMPRESS Vessel Drafting Program 5.53
o PDMS (3D Plant)
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
02/2015 02/2016
Project: Engineering, Procurement, Construction and Commissioning of 10 MW Waste Energy Power Plant in Saraburi, Thailand
12/2016 12/2017
Project: Engineering, Procurement, Construction of 8 MW Landfill Gas Power Generation and Transmission Line Plant in Nakorn Pathom, Thailand
05/2010 - 05/2011
Project: Muara Tawar Gas Fired Power Plant Extension Project, PT.PLN (PERSERO), Indonesia
05/2010 - 05/2011
Project: ELAINEL Sokhna Supercritical Thermal Power Project 2x650 MW GAS/OIL Fired Units, East Delta
Electricity Production Company, Arab Republic of Egypt
05/2010 - 05/2011
Project: BLCP Power Project, BLCP Power Company, Thailand
05/2011 - 08/2011
Project: Gas Desulfurization Plant, SILVANI Company, Russian