YINDA TECHNOLOGY (THAILAND) CO., LTD. (formerly known as CMC Communications (Thailand) Co., Ltd.)
240/63 Ayothaya Tower, 25th Floor, Soi Ratchadapisek 18, Ratchadapisek Rd., Huaykwang, Bangkok 10310. Tel : 02-692-7600
สำหรับสมาชิกเท่านั้น
Project Dtac North East (NOKIA) 3G ,2100 ,4G ,2100, TDD2300
- Tuning each Problem Area (PA) of cluster to optimum point and find next solution.
Acceptance cluster and Tuning cluster, Monitor KPI after cluster on-air.
- Site Solution TDD2300 of North East(NMA, BRM,SRN)
Project Dtac South (NOKIA) 3G ,2100 ,4G ,2100, TDD2300
- Drive test & Analyze SSOA 3G2100, LTE2100
- Planning team subcon survey TDD of region (SKA,NRT,SNI)
- Make report TSSR TDD2300 and Site solution of install TDD2300 (SKA,NRT,SNI)
Project True 3G2100, LTE1800
- Walk test and optimization Project True 3G2100,LTE1800 2100 PAT Report ,CVT Report ,CQT Report
มกราคม 2560 ถึง พฤษภาคม 2560
Optimization Engineer
Cellconsult co,.Ltd
หมู่บ้านกลางเมือง 1111/140 เขตจตุจักร กทม
สำหรับสมาชิกเท่านั้น
Optimization Project Dtac South 3G 850,2100 ,4G 1800,2100
-Tuning each Problem Area (PA) of cluster to optimum point and find next solution.
- Acceptance cluster and Tuning cluster, Monitor KPI after cluster on-air.
-PAT Evo Report.
Optimization Project AIS North East 4G
-Tuning each Problem Area (PA) of cluster to optimum point and find next solution.
Drive Test and optimization Project Roll Out
-SSV , SSOA, PAT Cluster, 3G 850-2100 MHz of Dtac
Drive Test and optimization Project Complaint
-VIP case, Customer complaint, Upgrade and rehoming test
Activity, walk test, (GSM, WCDMA) (Voice, HSDPA, HSUPA, R99UL, R99DL, Ping) with equipment and tools walk test engineer worked on TEMS and Special test cases.
Drive test LTE Able to perform CSFB, Voice quality(MOS),
2G, 3G and LTE of Dtac.
Drive Test and optimization Project Ericsson North CVT 900 and 1800 MHz of True
Project Planner: Loxley Co.,Ltd , Feb 23 – Present
•
M6/M81 Motorway Project : Communication Network System
-
Monitoring and tracking project progress, and writing up reports.
-
Report an expected event to the project team.
-
weekly/monthly progress reports.
-
Monitor to ensure compliance with installation standards.
-
Ensure projects meet deadlines and Approval Plan.
Senior Project Engineer: CCS Comservice (thailand) Co.,Ltd May 20 – Jan 23
•
Pink Line/Yellow Line Project: Signalling System , Communication System
-
Planning and managing teams according to the plan
-
Purchase material follow specification of project.
-
Draw the installation design (cable containment).
-
Support customer planning of project.
-
Manage and monitor project costs.
-
Prepare and issue weekly/monthly progress reports.
-
Monitor, inspect and control subcontractors to ensure compliance with installation standards
-
Prepare the necessary documents for the audit.
-
Ensure projects meet deadlines and Approval Plan.
Project Engineer : JPJ Industrial Services Thailand) CO..,LTD, Nov 2019 Mar 2020
Survey and drawing.
Planning Construction of Project.
planning and management to Schedule and follow specification according customer.
Provide Job Safety Analysis JSA) prior conduct before activities.
RF Optimization: OCK Steadcom Thailand CO.,LTD, March 2019- Nov 2019
• Project Dtac (Ericsson) TDD2300,4G ,2100, TDD2300
-
PAC ,FAC report.
-
Acceptance cluster and Tuning cluster, Monitor KPI after cluster on-air.
ประวัติการฝึกอบรม
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย คำ/นาที อังกฤษ คำ/นาที
รถยนต์ ,
รถยนต์ ,
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
M6/M81 Motorway Project : Communication Network System
Pink Line/Yellow Line Project: Signalling System , Communication System