Managed materials orders and delivery plan more than 250 items to work with local & oversea suppliers (MRP).
Maintained master data of new materials in SAP by cooperate with R&D (NPI).
To work jointly with production and warehouse management to plan of their capacity requirement for the agreed operation.
Work with supplier development, supply management and technical development to improve Suppliers quality through supply chain project and SSQR program.
To provided production plan (PDP) of sub-assembly to ensure main production smoothly.
Effectively work with demand planer, quality team and thirds party to provide finished goods distribution plan (DRP) to ensure customer satisfaction.
มิถุนายน 2559 ถึง เมษายน 2562
Senior Production Supervisor
Sony Technology (Thailand) Ltd.
Bangkadi Industrial Park
สำหรับสมาชิกเท่านั้น
Developed and Implemented new system support operation to easy management.
A success audit in area; ISO 9001, ISO 14001 & OHSAS 18001, Customers audit, Factory handbooks audit, AEO and Internal audit etc.
Provided budget of section and present to manager as target commitment include development plan for reduce cost.
Monitor and control the fiscal expense budget of finished goods warehouse section as target commitment.
Prepared and conducted employee evaluations, counseling, disciplinary actions and administers the Attendance policy.
Wrote and Maintained finished goods warehouse procedures and work instructions, user guides and other quality management system documentation.
Managed warehouse storage conditions to optimize storage capacities while ensuring efficient warehouse operations and inventory control 100% accuracy.
Control and inspect production process include solve problems in process.
Effectively work with planning team, manufacturing, quality team, logistic team and other support teams to determine the availability of units and priorities for shipments to ensure customer satisfaction.
Maintained physical condition of finished goods warehouse by planning and implementing new design layouts; inspecting equipment; Requires to relate function for repair and replacement.
Safeguards finished goods warehouse operations and contents by establishing and monitoring security procedures and protocols.
ประวัติการฝึกอบรม
มีนาคม 2554 ถึง พฤษภาคม 2554
NXP Manufacturing (Thailand) Ltd.
Process Engineer Trainee : Support project engineer in Die Attach, Epoxy Cure and Wire Bond process
กุมภาพันธ์ 2555 ถึง กุมภาพันธ์ 2555
Moody International (Thailand) LTD.
ISO14001:2004 Requirement
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (ดี) อ่าน (ดี) เขียน (ดี)
ไทย 35 คำ/นาที อังกฤษ 40 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
Computer skill in Microsoft Office, SAP and basic programs
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Special Projects
Study of Porous NiTi-Ta Produced by Powder Metallurgy Technique: The research project presents preparation of porous NiTi material by powder metallurgy using vacuum sintering technique. Tantalum is used as a transient liquid phase creator while pore size and shape are controlled using NaCl space holders.
(Thesis acceptance for poster presentation in The 5th Thailand Metallurgy Conference: TMETC5, 2011)