Check Node B Equipment Installation Huawei, Integrated Site Huawei, Edit and clear Alarm, Coordinate between customer and implementation team to complete work.
Config FTTx Zhone
Config ONU Zhone
Config Msan Zhone
April.2020-Present: Warehouse Engineer at ZTE Thailand Co., Ltd.
Check equipment & plan subcon receive equipment for install.
Plan & check equipment dismantle RN subcon to ZTE.
Balance picking device, AIS Ph. 5G Q220 & 320, Ph..UniRAN19, 4G Q320, Coverage ph.1, Ph Swap
Balance DN device in warehouse.
Balance RN device in warehouse.
Design solution GNG Plan ph. Swap
Warehouse quality control
Aug.2019-April.2020: Site supervisor at IBS Corporation Limited
Responsible for the Wi-Fi project, Plans PAT for NBTC and Inspector, Clear alarm site issue, Integrate commissioning site, Check Equipment Installation, Check document PAT & FAC.
Aug.2018-July.2019: Site Supervisor at Ericsson (Thailand) Co., Ltd.
Check Node B Equipment Installation Ericsson Project D-tac, Clear alarm, Integrate commissioning Node B, Check PAT Photo RSA, Check document SDE FAC, Check BOQ, Check material return.
Apr.2016-July.2018: Site Supervisor at Huawei Technology (Thailand) Co., Ltd.
Check Node B Equipment Installation Huawei Project True move, Integrated Site Huawei, Edit and clear Alarm, Coordinate between customer and implementation team to complete work, Check document on ISDP & approve.
Dec.2015-Apr.2016: Project Manager at TXRX Technology Co., Ltd.
Internet system work FTTX, VDSL, ADSL project CAT Telecom.
Create a TOR (Term of Reference) to propose a project.
Create a BOQ and set the price for the installation team.
Coordinate with Condo & CAT Telecom project for project implementation.
Control the project implementation to be in accordance with the specified time and cost.
Approve cost documents in the project.
Jun.2014-Nov.2015: Engineer Management and Technical Support at Global Mesh Co.,Ltd.
Supporting the installation of the FTTX TOT project.
OLT configuration.
ONU configuration.
PAT & Test inspection signal support, FAC.
Support for NOC Check Alarm.
Support server to program.
Jun.2013-Apr.2014: Project Engineer at Teloneer Co.,Ltd.
Check Node B Equipment Installation Nakia Project AIS & TOT, Clear alarm, Integrate commissioning Node B, Documentation for PAT, Test alarm, Test Signal for PAT.
Apr.2013-Jun. 2013: Qurity Assurance Engineer at CH-switch tech Co.,Ltd.
Test work to มอก. Standards.
Factory quality inspection according to ISO standard.
Nov.2012-Fep.2013: Test Engineer at ETA Thailand Co.,Ltd.
Electronic equipment test IC, Transistor To get the desired value of the customer.
calibrate the test machine.