Maintenance & Construction Petrochemical plant (Map Ta Phut Industrial Estate)
Responsibilities
Bidding.
Material Take off.
Planning.
Coordination with Client Construction.
Field Construction.
Field Measurement /Auto cad drawing isometric.
Professional Experience
Responsibilities
Bidding.
Material Take off.
Planning.
Coordination with Client Construction.
Field Construction.
Field Measurement /Auto cad drawing isometric.
Work Experience
Project that have been prepared
2018 Year
Project the work I have to do
- Multi-propose Jet reactor & Post treatment pilot Plant. (ThyssenKrupp)
- Gas Scrubber Mechanical and Piping Work Package. (ThyssenKrupp)
- Shut Down Coating II MTP2 RX4 replacement temporary support for new RX4. (Coating II)
- PAA MET 1 Tank retrofit spot and Vent scrubber duct Piping. (Coating I)
- Cooling tower reconstruction Project. (EBSM Plant)
- Change dock leveler SCO PE12 and PU Project. (SCO Plant)
- Upgrade new blower type of regeneration blower BY-611. (SPE I Plant)
- Upgrade plant air dryer to bigger size. (SPE II Plant)
Responsible
- Fabrication control, assembly and Erection for piping
- Material control / Coordination Plant
- Material Receiving Inspection, Check the material appearance & size & quality
- Coordination of all engineering and design activities.
- Coordination with Client Construction, Project Control and Procurement personnel.
- Piping & Structure Bidding.
2017 Year
Project the work I have to do
- PO Pipeline Project. (DOW Chemical Thailand Company)
- Shut Down Inline CTW to solve hammering issue. (PU/LTX Plant)
- Install metal detection system at super sack and seabulk loadings SCO&SPE II. (SCO Plant)
- SCO PS Extended steel structure for silo Project. (PS Plant)
- Install redundant strainers at recycle solvent bed Y-621 Project. (SPE Plant)
- PAA Warehouse Capacity Increase. (Coating I)
- Upgrade flow meter to wedge type project. (PU Plant)
Responsible
- Fabrication control, assembly and Erection for piping
- Material control / Coordination Plant
- Material Receiving Inspection, Check the material appearance & size & quality
- Coordination of all engineering and design activities.
- Coordination with Client Construction, Project Control and Procurement personnel.
- Piping & Structure Bidding.
2016 Year
Project the work I have to do
- Shut Down / Turnaround SPE II Plan Site DOW MTP
- SPE - Build line to connect PE1 hopper to PE2 packing line for packaging flexibility [SPE Plant]
- PO Transfer Pipeline to MTP Rigid Polyol Plant (Thyssenkrupp)
- Spent Solvent Loading at LS-100 (PU Plant)
- Uninstall PS silo and system at King foam Samut Prakan Field (PS Plant)
- TS&D Building Expansion Project (Area Preparation)
- PV Films - New Facility Fence & Gate (PV Films)
- Install metal detection system at super sack and see bulk loadings (SCO Plant)
Responsible
- Fabrication control, assembly and Erection for piping
- Material control / Coordination with Client Construction, Project Control and Procurement personnel.
- Material Receiving Inspection, Check the material appearance & size & quality.
- Piping Bidding.
2015 Year
Project the work I have to do
- Shut Down Coating II CCTL Improve Filer Press for WWT
- Install redundant strainers at recycle solvent bed Y-621 [SPE 2]
- Spent Solvent Loading at LS-100
- Reroute outlet PSV at butane metering station
Responsible
- Piping Fabrication control, Assembly and Erection.
- Material control.
- Coordination with Client Construction.
2014 Year
Project the work I have to do
- Shut Down &Turnaround SPE I Plan Site DOW MTP
- Change PS of Outlet DY-611 to suction BY-611
Responsible
- Piping Fabrication control, Assembly and Erection
- Material control
- Coordination of all engineering.
2013 Year
Project the work I have to do Piping fabrication and install line fire sprinkler for PU Formulation warehouse (PU/SCO Plan Site DOW MTP)
Responsible
- Piping Assembly and Erection
- Planning & Material control
- Auto cad Drawing isometric / Revise Drawing
- Coordination of all engineering.
Abilities Interests & Skills
Ø Good knowledge in computer, i.e., Microsoft Office, Photoshop, Windows Movie Maker,
Internet Explorer, Solid Works, Auto cad etc.
Ø Interesting in organize to activity of Faculty
Ø Interesting in new knowledge about organization
Ø Interesting in new technology and computer
Ø Reasonable, accept to learn new thing, listen others opinion, flexible, friendly, adaptable to
New environment