Using M2000 for check all parameter for optimization.
KPI monitoring , Solving and improvement.
Analyst log file Walktest and Drivetest 2G & 3G.
Create report walktest and drivetest 2G & 3G.
Check Handover between the Neighboring cell.
Adjust Parameter with M2000 3G850,M2000 3G2100.
Check and planningNeighboring for 2G,3G850 and 3G2100.
Neighbor Audit from NASTAR.
Analyst Daily alert , Worst cell ,Black cell and solving problem.
Survey and planning new site and planning relocate& planning data-config for site Macro.
Check and support customerand VIP complaint analysis.
Survey and planning data-config new site Temp Node and COW support for Event.
Check PAT report for IBC.
กรกฎาคม 2557 ถึง มิถุนายน 2562
Project Manager
CMM Communication Company Limited
288/53 Taradee Biz Moo 5 Tambon PakKret district PakKret Nonthaburi 11120
สำหรับสมาชิกเท่านั้น
Analyst log file Walk test and Drive test 2G & 3G.
Drive test Tems AIS 3G900, Nemo True 3G850
Report IBC
Commissioning AIS 3G900, DTAC 3G850 U21 LTE
Installation of control to install Dtac 3G850 U21 LTE
Install, Cut over and Remove IP RAN Ais Project
T-Boom Project True move
: Site Survey Report, SAFF Report, TSS, Drawing, Civil construction, TE Work
ประวัติการฝึกอบรม
มีนาคม 2552 ถึง พฤษภาคม 2552
บริษัท ทีทีแอนด์ที จำกัด
นักศึกษาฝึกงาน
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย 30 คำ/นาที อังกฤษ 20 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถจักรยานยนต์ ,
MS Office, visio, Dreamweaver, php, sql, linux, Computer Network and Hardwere