Product: - Steel & Copper & Aluminum, Heat Treatment (Cold work, Hot work, High speed, Injection, Blanking, Plastic Mold) Finishing plate milling, CNC milling, grinding
Man power: - 250-300
Responsibility
- Factory management
- Quality System management
- Safety management
- Engineering management
- WH and Delivery
Job Summary :
Improvement
Manage and review KPI. and set up activity
Manage production planning, material, and production process to achieve on-time delivery.
Adjust manpower, machine capacity and tooling
Implement and drive continuous improvement activities throughout the plant.
Evaluate manufacturing processes to identify potential improvements.
Improve manpower utilization throughout the division.
Optimize product flows to reduce waste.
Set up processes and systems to create a foundation for long-term improvement.
Implement a cross-functional training team work.
New Products
Provide estimated and actual production data (process flows, cycle times, etc.) to Costing.
Develop new product technologies to drive innovation and improve production efficiency.
Delivery on-time of samples to right quality, and can be produced in mass production
Management/Leadership/Culture
Motivate employees to achieve key performance indicators (KPIs) and overcome challenges.
Identify training and development needs for the division.
Minimize employee turnover rate.
Quality
Ensure that products are manufactured according to product spec.
Evaluate and find the best solution for all quality issues.
Review customer complaints and take appropriate corrective and preventative action
Safety/Environment/ 6S/ Other
Compliance Policies control
Risk Management
Employee Survey
OHSAS 18001 SMR (chairman)
Safety committee (chairman)
Energy saving committee (chairman)
Ensure safe working conditions and suitable work environment for all employees
Continuously work to improve safety by addressing both physical safety issues and employee safety attitudes.
Implement 5S strategies to maintain and improve housekeeping in all areas.
Maintenance
Retrofit machine
PM plan (monthly & yearly)
Project Improvement
Machine breakdown control
Equipment / Spare parts
Contractor project
Product: - Plastic products (Blow MC. and injection MC.) 1. Automotive parts, 2.Bag PE, PP, HDฯ, Printing, Film sheet, 3.Hospital Supplies (medical equipment), 4.Sewing)
Man power: - 300-350
Responsibility:
Production - Production system control
- Delivery plan
- Production planning
- Efficiency and Defect control
- OEE control
- Cost down control
- Improvement process
- QA system
- Quality product control
- Analysis problem solving process
- Follow up Goal, KPI and Activity
- Cost down control
- Man power control
Maintenance
- KPI & Activity support
- PM plan (monthly & yearly)
- Daily maintenance report
- Utility control
- Project Improvement
- Machine breakdown control
- Start up machine control
- Spare parts control
- Equipment control
กุมภาพันธ์ 2551 ถึง กรกฎาคม 2553
Production manager
IAMPAISAN Co., Ltd
84/96-100 M.6 Bang-khuntien Bangkok
สำหรับสมาชิกเท่านั้น
Product: - Plastic Tableware (Melamine)
Man power: - 400-450
Responsibility:
Production
- Production line control (molding and packing)
- Production control (PC)
- Delivery plan
- Printing paper control
- Efficiency and Defect control
- OEE control
- Costs down control
- Improvement process (machine, Cycle time)
- Quality product control
- Analysis problem solving process
- Follow up Goal, KPI and Activity Support
- Mold maintenance (Compression mold)
- Tooling mold
- Man power control
Maintenance
- KPI & Activity support
- PM plan
- Daily maintenance report
- Utility control
- Project Improvement
- Machine breakdown control
- Start up machine control
- Spare parts control
Position: - Asst Production and Engineer manager
Product: - Plastic Products (injection, Blow and compression)
Man power: - 400-450
Responsibility:
Production
- Production line control (molding and packing)
- Production control (PC)
- Delivery plan
- Printing paper control
- Efficiency and Defect control
- OEE control
- Costs down control
- Improvement process (machine, Cycle time)
- Quality product control
- Analysis problem solving process
- Follow up Goal, KPI and Activity Support
- Man power control
Project engineer
- New model control
- Data new model (BOM, WI, Condition setting)
- PI. (Product information), Data engineer
- Knowledge & Control injection mold and compression mold
- Mold maintenance (Compression and injection mold)
- Tooling mold
- Improvement, modify, repair mold
- Trial mold data
- Design special function mold for start production
- Design new model for customer approved 2D (Auto cad)
- Design jig fixture for new model 2D (Auto cad)
- Discuss supplier and customer
- Development of material for start product
ประวัติการฝึกอบรม
กุมภาพันธ์ 2546 ถึง กุมภาพันธ์ 2546
สถาบันเพิ่มแผลผลิต
การเพิ่มผลผลิต
กันยายน 2556 ถึง กันยายน 2556
Arburg machine
กานใช้เครื่องฉีด Arburg
กุมภาพันธ์ 2550 ถึง กุมภาพันธ์ 2550
- Energy saving committee, Safety committee, 5S. Committee