Responsible for detail instrument construction engineering work schedule planning and project management, such as
• Detail design Instrument hookup and typical installation drawing for instrumentation.
• Detail design instrument cable routing
• B/Q for instrument cable tray
• Site supervision and management for installation Instrument work
• Commissioning
WORK EXPERIENCE
May 3, 2017 – Present
Sutech Engineering,Ltd. / Bangkok
Senior Instrument Engineer / Engineering and Technologies Department
Handle Project:
• Project : United Sugar mills, LTD. / The Expansion of Sugar Refinery capacity 2500 tons/Day / Bangladash
• Project : Meghna Sugar Refinery Ltd / The new sugar refinery capacity 3000 tons/Day
• Project : URC group (SONEDCO) / Sugar mill line2 capacity 6000 Tons/Day / Philippines
• Project : Korat Industrial Co., Ltd / Bagasses Diffuser
• Project : Korat Industrial Co., Ltd / 4CVPs for Raw sugar 18000 Tons/ Day
• Project : Sikhio Sugar energy complex project
Responsibility :
Responsible for detail instrument construction drawing work, detail of fabrication and installation drawing, engineering work schedule planning and project management, drawing such as
• Plot plan of field instrument
• Layout of instrument wiring
• Layout of instrument main cable
• Layout of instrument main cable way (tray)
• Layout of utility piping for instrument
• Layout of instrument wiring in CCR
• Instrument hook-up drawing
• Instrument wiring connection list
• Instrument cable drum schedule
• Instrument cable schedule
• B/Q for instrument hook-up drawing
• B/Q for instrument cable tray
• Typical drawing for instrument fabrication
• Instrument list
• Instrument specification sheet
• Instrument loop diagram
• Instrument junction box diagram
• Commissioning
WORK EXPERIENCE
March 2, 2015 – Aprial 30 2017
Pro-En Technologies, Ltd. / Bangkok
Instrument Engineer / Business Engineering Department
Handle Project:
• Project : HUNTSMAN / Construction Management For SSU FT-Dye Debottleneck Project
• Project : HUNTSMAN / Engineering design for INK Project
• Project : HUNTSMAN : Engineering and procurement services for spray dryer upgrade project
• Project : ABB Thailand : Electrical & Instrument Engineering service for LP1 and NR1 Project
• Project : STECON : Engineering design 12SPPs Steam pipeline project
• Project : Siamrajathanee / Engineering Services for Klongluang Natural Gas Pipeline & Metering Facilities System Project
• Project : Siamrajathanee / Engineering Services for Banpong Natural Gas Pipeline & Metering Facilities System Project
• Project : SCG Chemical / Engineering design for FEED Wax project
• Project : ABB Thailand / Electrical and Instrument Engineering Services for Methyl Ester Plant II
Responsibility :
Responsible for detail instrument construction drawing work, detail of fabrication and installation drawing, engineering work schedule planning and project management, drawing such as
• Plot plan of field instrument
• Layout of instrument wiring
• Layout of instrument main cable
• Layout of instrument main cable way (tray)
• Layout of utility piping for instrument
• Layout of instrument wiring in CCR
• Layout of instrument grounding
• Instrument hook-up
• Instrument wiring connection list
• Instrument cable drum schedule
• Instrument cable schedule
• Typical drawing for instrument fabrication
• Instrument list
• Instrument data sheet
• Pre-Commissioning